Set a BOM to create 10^k units of Product P, using n units of raw material R.
On R, put rounding to 1 unit.
Create a MO to produce 1 unit of P.
Since it needs n/10^k units and rounding is set to 1,
it sets 1 unit of R to consume.
Now "update" (quantity to produce) to 10^k'.
It correctly updates the quantity to consume.
However, since it doesn't update the unit_factor, when you "produce",
it will consume 10^k' units instead of 1.
We copy the way the unit_factor is initially computed when updating the lines.
opw 1903776
closesodoo/odoo#29067
- Create the following BOM structure:
```
Prod 1 (Manufacture)
|
--- Prod 2
Prod 3 (Kit)
|
--- Prod 4
Prod 5
```
- The BOMs for Prod 1 & 3 must have a routing set, to generate
workorders
- Create a MO for 1 unit of Prod 1, process to the end
2 units of Prod 1 are created instead of 1.
This is due to the WO for Prod 3 not having a `next_work_order_id`.
Therefore, `record_production` adds an extra quantity at:
```
production_move.quantity_done += self.qty_producing
```
To prevent this, we set as `next_work_order_id` of the BOM of Prod 3 the
WO of Prod 1.
Closes#19527
opw-1817398
opw-1883693
- Create 2 Products A and B, tracked by serial number
- Create a BOM for A:
1 Unit of B
- Create a MO for 2 Units of A
- Validate:
Product with S/N A1 consumes B1
Product with S/N A2 consumes B2
- Unbuild A2
If A1 was created before A2, B1 will used as a component of A2 at
unbuild.
When going through the stock move lines, we don't verify that the lot
produced matches the lot we unbuild.
opw-1889002
closesodoo/odoo#28154
Producing a manufacturing order on components with more than one unit
could leads to multiple move line reserved on this component. Marking the
workorder as done, in that case, will trigger an error saying "Cannot set
the done quantity from this stock move, work directly with the move
lines". Instead of setting the quantity done directly, this commit
uses the magical function _set_quantity_done() that manage the case
of more than one move lines.
OPW-1888780
closesodoo/odoo#27773
Swiping a credit card through pos_mercury no longer worked on the
payment screen.
3a74afd21e introduced some special code
in BarcodeEvents for mobile Chrome. This code relies on an invisible
input being filled in by barcode device. On the payment screen the POS
uses a keypress event handler on body to manage input. This handler
preventsDefault which stops the input from being filled in.
It's worth noting that this new approach in
3a74afd21e is not fully equivalent to
the original barcode events handler. Events are not redispatched, so
this effectively disables keyboard input on the payment screen (or
anywhere where it is used).
opw-1888466
closesodoo/odoo#27820
Producing a manufacturing order on components with more than one unit
could leads to multiple move line reserved on this component. Marking the
workorder as done, in that case, will trigger an error saying "Cannot set
the done quantity from this stock move, work directly with the move
lines". Instead of setting the quantity done directly, this commit
uses the magical function _set_quantity_done() that manage the case
of more than one move lines.
OPW-1888780
closesodoo/odoo#27773
In the current code, we only show a PDF previewer if a PDF is already
saved. When the PDF is changed we see the preview if it was previously
saved also.
This seems to be the expected behavior, but this changeset changes it so
we could always show a preview.
opw-1888399
closes#27393
Steps to reproduce the bug:
- Create three stockable products P1, P2, P3
- Create a BOM for P1 with P2 and P3 as components
- Create a MO with 5 P1
- Check the availability and plan it
- Go on the WO and process only 3 P1
- Go to the MO and update the quantity to 3
Bug:
From this point, it was impossible to pass the MO to the state= 'done'
With this fix, you can now, click on "Post inventory" and the button
"Mark as Done" will appear.
opw:1874227
- Create a BOM for Product P with the following component:
Product C, 5.0 units
- Make some stock for C:
2 units in location 1
3 units in location 2
- Create a MO for P, reserve.
When trying to produce an error arise:
> Cannot set the done quantity from this stock move, work directly with
> the move lines.
If the user tries to unlock the MO in order to set the done quantity on
the move lines, the same error will arise when trying to produce.
In the specific scope of the production, we set the quantity done on the
move line instead of directly on the move, to avoid this limitation.
opw-1871241
Co-authored-by: Arnold Moyaux <arm@odoo.com>