Steps to reproduce:
-------------------
- Go to Working Time and modify a calendar using "Switch to 2 weeks calendar"
(not the default company calendar);
- In the Employees App settings, change the "Company Working Hours"
to the edited calendar;
- Create a new company.
Issue:
------
We have the error: "Attendances can't overlap.".
Cause:
------
When we create a company, we will use the `_default_get` method
to get the default values for the `attendance_ids`.
So we will copy the attendances from the current company,
but we won't copy the `week_type` value.
In addition, the `two_weeks_calendar` value will be `False`.
As a result, overlaps will be checked as for a one-week calendar.
This will trigger the error.
Solution:
---------
If you want to get the current company's attendances by default,
make sure it uses a one-week calendar.
If this is not the case, we take the default (hardcoded) attendances.
Note:
-----
Since the commit 292508e8a749bf32e40995454da6122cd3c1df77,
it was no longer possible to modify a company's default calendar.
It is reverted.
With this FIX, this is now possible.
opw-3446789
closesodoo/odoo#131872
X-original-commit: 22c12db1f009686fa4c3861c398ba178b2785ead
Signed-off-by: Sofie Gvaladze (sgv) <sgv@odoo.com>
Signed-off-by: Thomas Lefebvre (thle) <thle@odoo.com>
Currently, only stable releases see their translations updated. This has
resulted in master accumulating outdated stuff for years, which can be
confusing for users testing master on runbot.
This one-shot commit resynchronizes master translations based on the
content from 16.0 and removes empty PO files (i.e. no longer containing
translations).
closesodoo/odoo#121629
Related: odoo/enterprise#41171
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
They dates from < 2027 and are quite outdated. Favour the nl
translation instead.
n_BE is not on Transifex so it was not possible to correct bad
translations.
closesodoo/odoo#115845
X-original-commit: d04c8b7e484db8306d858c891a7a2b11885fdcd9
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
Steps to reproduce:
In Working Times, click on "SWITCH TO 2 WEEKS CALENDAR"
for the default calendar used by the company.
Issue:
A ValidationError appears: 'Attendances can't overlap.'
Cause:
To create a two-week schedule, by default,
we will use attendances provided for the company's default schedule.
When we want to switch from a one-week schedule to a two-week schedule,
we first delete the attendances from the schedule to be modified.
However, if this schedule is the company's default schedule,
it will no longer have the default attendances
that we must use to build the two-week schedule.
So we end up with the two "fictitious" attendances
that are used to delimit the two weeks.
With only these two attendances, the constraint of not having
two overlapping attendances is not respected
(because the two attendances created will be modified
to belong to the same week).
Solution:
Check that the calendar to be modified
is not the default calendar used by the company.
opw-3127337
closesodoo/odoo#112912
X-original-commit: 2f56ffbc2f1d3a2afbf51a859a5a5730af06fd6f
Signed-off-by: Kevin Baptiste <kba@odoo.com>
Including demo data this time
closesodoo/odoo#58862
X-original-commit: 575abde110acb3d12b25f177a863374becef0894
Related: odoo/enterprise#13705
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
Mainly transifex issues but also some errors found through 'grep' checks.
Fix typos and obscure english strings in xml contents, fields strings/helps, some docstrings, ...
ensuring correct translations base (and fallback when translations isn't available).
closesodoo/odoo#57276
X-original-commit: 4214f05d454bca2b60fda3a288d529c098e84f77
Related: odoo/enterprise#13053
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
Signed-off-by: Victor Feyens (vfe) <vfe@odoo.com>
In a calendar with 2 weeks mode (odd and even), before this commit, all
new created periods (placed in one of the two sections) don't have the
week_type field set. This generates a confusion, because a period that
should be applied only in odd weeks, for instance, it was applied also
in the even weeks.
Now, the new periods will have the week_type field set with the
week_type of the section where is it. Also, an error message is raised
if a period is not in one of the two sections.
opw-2239966
closesodoo/odoo#50478
X-original-commit: 33a62118818952872321591e85403b657380128a
Signed-off-by: Nicolas Lempereur (nle) <nle@odoo.com>
Signed-off-by: Jorge Pinna Puissant (jpp) <jpp@odoo.com>
Followup of a425695e
The terms were back in 12.0
Courtesy of Juan José Scarafía
closesodoo/odoo#41624
X-original-commit: 85d0c7001a997748d7691205bbb8d066597591a5
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>