Debauche Stéphane 8944674d6d [REF] mrp: date_planned_start and date_planned_finished
Before this patch, writing on the `date_expected` field on the raw moves did not
update the `date_planned_start` (but writing on `date_planned_start` did write on
the raw AND finished moves `date_expected`).

This proved to be wrong: having the same `date_expected` on both raw and finished
moves did not make sense (the manufacturing order is not instantaneous). It also
makes difficult to make the rescheduling work: the rescheduling is done on the stock
moves and thus updates `date_expected` on the raw moves. If this information is not
transmitted to the manufacturing order, we won't be able to continue the rescheduling
on the finished moves (the idea is to update the raw moves which will update the
date_planned_start which will update the date_planned_finished which will update the
finished moves)

To have a more sane system, the `date_planned_start` and `date_planned_finished` are
computed (with an inverse) on the raw and finished moves `date_expected` (similar to
what's done on the picking model). There's a tweak though: as `run_manufacture`
creates first the order with a `date_planned_finished` and then confirm it (which will only
create the finished move at this moment), there's no place to write `date_planned_finished`.
The compute thus defaults on `date_deadline` which is stored and the finished moves
will be created later on with this value.

We implement the same logic `_onchange_date_planned_start` in `write` so that it doesn't
only rely on the onchange mechanism and the rescheduling can work when changing the
`date_expected` on a child mo for example.

task-1970595
2019-12-20 10:11:50 +00:00
Pratima Gupta d255bdbfac [FIX] mrp: delivery moves not cancelled
Before this -
If we have follwing configuration -
Manufacturing -> Propagate Cancel -> True
Buy -> Propagate Cancel -> True

* BOM of a Car -
	1) Component 1 -> Iron (MTO & Buy)

Now create a SO of product Car and confirm it.
It will create a MO (Car) and then PO (Iron).
Now if PO is cancelled, it will cancel its
move_dest_ids and on change of it MO will be
cancelled but delivery move will remain ongoing.

When action cancel is called on a move raw, it will
check if the production order is also cancelled.
If the MO is cancel, in this case cancel also its
move finished.

Task-2117832

closes odoo/odoo#42209

X-original-commit: 9522e51a3b290c91f23658a4fb781003ff1fd8d2
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-12-19 16:45:55 +00:00
William Henrotin 9503f463e3 [FIX] mrp: always show post inventory button
The inventory button was shown or hide depending of the product valuation.
As the valuation was previously stored on the stock moves and posting
split the stock moves. Fifo and Avco valuation was not well computed.
The migration to stock valuation layer fixed this behavior. This
commit shows the post inventory button as soon as there are some
finished move to be posted.

task : 54665

closes odoo/odoo#41781

X-original-commit: 5dfa3f817d3a9f47a863a587569a862a40c7d159
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2019-12-10 12:41:06 +00:00
William Henrotin 21834430a1 [FIX] mrp: post partial production with workorders
The commit 75460e697a was introduced in
v12, when the workorder stored their consume data on stock.move.lines.
Their was an issue when posting intermediary inventory on productions
using workorder. As those 'dummy' stock.move.lines did not have their lot
field filled, an error at line validation was raised.

In v13, the workorders use workorder lines. The lots and quantity are
transfered on real stock move lines only at the end of the production.
Posting intermediary inventory did not failed anymore in case of partial
production

Task : 54665

X-original-commit: a41239b378a1cae394d18f43e991ec8bceeac826
2019-12-04 10:26:24 +00:00
William Henrotin 53252ed7bc [FIX] mrp_workorder: suggest total quantity by lot
Use case:
Plan a production of 10 units on 2 workorders. Produce 4 units of lot1.
Record the production and produce the 6 next ones with the same lot1. On
the second workorder, the suggested quantity is 4 and not 10.

This issue is due to the fact that we fill the next workorder quantity
only at the first production batch and we don't check that the same lot
can be used again.

This commit call the mathod to update the quantity on the next workorder
if the first lot is produced again.

closes odoo/odoo#41189

Opw: 2127665
X-original-commit: e15fc6ac994edabc8907c13295c883cff9320d10
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-11-29 15:23:26 +00:00
fw-bot cfbeed761a [FIX] mrp: unit_factor computation
Updating the quantity to produce in a production order will recompute
each raw move's unit factor. The issue was this computation did not
take care of the previously product quantity. The unit factor was wrong
and so the next created workorder lines get the wrong quantity.

Example:
  - 1 components for 1 finished product (unit_factor = 1)
  - Create a production for 2 finished product -> quantity to consume = 2
  - Produce 1 then change quantity to produce to 3 -> quantity to consume = 3
    and quantity done = 1 but unit factor became 1.5

closes odoo/odoo#40990

X-original-commit: 79976600df45afc6150150734eef405fd41a70a3
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2019-11-27 14:05:26 +00:00
William Henrotin d813873f6c [FIX] mrp: convert quantity in product UoM
If a component is used in a production with another unit of measure
than it's one, the created stock move line could not convert the quantity
correctly.
If there is enough quantity in stock, the created move line takes the
quant uom but the quantity in the production ones.
ex: consume 1 dozen, the quantity on the stock move line is 1 unit

This commit always uses the wo line's UoM and quantity to create the
stock move line.

closes odoo/odoo#39222

Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-11-22 12:39:52 +00:00
William Henrotin 6b4f447de9 [FIX] mrp: consumption required 2019-11-22 12:39:52 +00:00
William Henrotin 58df6c86e0 [FIX] mrp: new stock move line in traceability report
Before this commit, The addition of new stock move lines in a
finished production via the unlock button did not impact the
traceability report. This was due to the fact that the new sml
has not been linked to the finished_lot_id.
2019-11-22 12:39:51 +00:00
William Henrotin e1f518bb83 [IMP] mrp: add components in workorders
This commit extend the flexible consumption. On the workorder form view.
It's now possible to add directly new workorder line with any product
(even one not in any BoM line). For those new wo line. A confirmed stock
move is create in the record_production step.

Task : 2082448
2019-11-22 12:39:51 +00:00
fw-bot abd9d1506e [FIX] mrp: error w/o traceback on create BoM
If a Bill of Material is created without code (eg. when created as a new
group from a kanban view grouped by BoM) we would get a traceback
instead of an error.

With this changeset, we get a "You cannot create a new Bill of Material
from here." error if it is being tried.

opw-2124162
fix #38904
closes #40289

closes odoo/odoo#40457

X-original-commit: 32c13cd7d1387c0ea81a9bb5968d18c2b8f32051
Signed-off-by: Nicolas Lempereur (nle) <nle@odoo.com>
2019-11-18 19:28:01 +00:00
Victor Feyens 9215e73fa2 [IMP] * : replace with_context(force_company=c) by with_company(c) 2019-11-18 12:25:05 +00:00
fw-bot e76276e083 [FIX] mrp,stock: error w/o traceback on create warehouse
If a warehouse is created without code (eg. when created as a new group
from a kanban view grouped by warehouse) we would get a traceback
instead of an error:

```
  The operation cannot be completed:
  - Create/update: a mandatory field is not set.
  - Delete: another model requires the record being deleted. If possible, archive it instead.

  Model: Warehouse (stock.warehouse), Field: Short Name (code)
```

opw-2124162
fix #40233
closes #40267

closes odoo/odoo#40382

X-original-commit: b6caa179e17199b29a9ca4009c53acb378423926
Signed-off-by: Nicolas Lempereur (nle) <nle@odoo.com>
2019-11-15 20:23:59 +00:00
Nicolas Martinelli 92aeaa47ff [FIX] mrp: date expected and date deadline
- Create Product A:
  Routes: MTO and Manufacture
  Manufacturing Lead Time: 20 days
- Create Product B:
  Routes: MTO and Buy
  Add a supplier with Delivery Lead Time: 10 days
- Create a BOM: 1 unit of B to produce 1 unit of A
- Create a SO for A, validate

A MO is created with a Deadline set at SO order date - 20 days => OK
A PO is created with order date set at SO order date - 10 days => Not
OK, it should be - 30 days.

In v13, the raw materials expected date is the order date.
In v12, this date is computed as: order date minus Manufacturing Lead
Time

However, in both versions the PO order date is computed as the raw
materials expected date minus Delivery Lead Time of the supplier.

This comes from a change in the semantic of 'Planned Date' and 'Planned
End Date'. In v13, the Manufacturing Lead Time is only taken into
account in the Deadline, while in v12 it was taken into account in the
Planned Date. However, the expected date of the raw materials still
relies on the latter, not on the Deadline.

In order to solve this, we apply the 'Manufacturing Lead Time' of the
product and the company to 'Planned Date', 'Planned End Date' and
'Deadline' when the MO is created. Note that the solution is still not
ideal in case no routing is set on the BOM since 'Planned Date' and
'Planned End Date' won't be updated later in the process.

opw-2118951

closes odoo/odoo#40360

X-original-commit: b523f991572e32e69c5f8000a21553191ca54773
Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2019-11-15 15:21:51 +00:00
William Henrotin 643c91aba6 [FIX] mrp: fix workcenter capacity
Planning the workorders depends on the quantity to produce of those workorder
This will create as much as production batch needed regarding the workcenter
capacity.

This method is good except in case of product tracked by serial number. In that
case the quantity to produce on the workorders is force to 1 regardless of
the quantity to produce on the production

closes odoo/odoo#40226

X-original-commit: 3c4133ddac256c63802a99461db49cc9bd9fa1d6
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2019-11-13 17:45:51 +00:00
Hetashree Chauhan 3116191e78 [IMP] mrp: log activity on parent manufacturing order.
Before commit: - If there are multi level production order,
and user cancelled any one then,
there is no activity logged on related production order.

After this commit: - In multi level production order
(i.e. one production order creates another production order
to consume the raw material)
 if user cancelled raw material production order then,
exception will be generated on main production order,
so that user can easily get the idea that
raw material for this production order is not available.

[ADD] sale_mrp: add testcase for cancellation of the multilevel production orders

task-1819526.

closes odoo/odoo#28708

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-10-28 10:30:29 +00:00
Arnaud Baes fb19bd6938 [FIX] stock: Support for optional components in kit
When a BoM is using a component with a quantity required set to 0,
tracebacks were occuring when computing the available quantities
for the kit.

Fixes #38807

closes odoo/odoo#39267

X-original-commit: 7676269ba56c8e293ef4cd3dffbe7eccbad4a9d0
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-10-23 15:08:25 +00:00
Swapnesh Shah 2fc92802cd [FIX] mrp: always set a value to computed fiec
Records were filtered so not every record was set in the for loop

Fixes odoo/odoo#38992
Closes odoo/odoo#39071

closes odoo/odoo#39234

X-original-commit: f7d5ba6f9ffccecffbb5b851bd2770ecef28520c
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
2019-10-23 09:10:02 +00:00
William Henrotin b86bc6e979 [FIX] mrp: cancelling and validating impact on planning
The commit 0679d0d introduced a new
planning mechanism for the workorder. Two issues have been instroduced
since this patch.
  1. Cancelling a workorder didn't free the time slot in the workcenter
    calendar
  2. Validation a workorder sooner than the planned date didn't update
    the workcenter calendar to plan another production sooner.

This commit update the date_planned_start and date_planned_finished
at cancellation and validation to impact the workcenters calendar.
To keep the original planning dates, they are now tracked

This commit also fix the button_start() method that always rewrited the
date_start even if the production had already been started.

Task : 2082442

closes odoo/odoo#38947

X-original-commit: 4ca6c773a00320865142e4efb3645f36c54ce9a2
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-10-17 12:17:49 +00:00
Naglis Jonaitis 19e4b89d65 [IMP] mrp: remove check_company attribute from float field
Since `check_company` is intended for relational fields.

closes odoo/odoo#38939

X-original-commit: bf2f3f6ce1430c2603fe7fe199a28296b2d7416f
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-10-17 11:32:02 +00:00
Arnold Moyaux e89c818e5a [FIX] mrp: missing cast string to date
Usecase to repdroduce:
- Create a manufactured product with route manufacture and a RR
- Run the scheduler.

Orderpoint will prepare procurement values's date as string. Other
module could possibly also use string as date and a call to from_string
will not break anything if the value is already a date or a datetime.

closes odoo/odoo#38900

X-original-commit: e4c654f8e5e768288226c725a1018ae31e8f5606
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-10-16 17:17:09 +00:00
William Henrotin 644663eb4a [FIX] mrp: rework of workorder planning
This commit redo the way workorders are planned on their workcenter
calendar. The resource_calendar_leaves introduced in 0679d0d is now linked
to the effetives dates (date_start and date_finished).
The planned dates copy their information onto effective date at the
workorder plannification or any modification before the actual production
(state = draft, pending or ready)

This way, the gantt view and calendar view display either the plannifaction
slot if the production isn't started yet and the effective production
time if it's done. The plannification is also impacted by validating
a production sooner than expected or cancelling it. In the first case,
the date_finished is set at 'now' and in the second case, all the dates
are emptied. The futur workorders will be planned on the newly recover
time slot.

This commit also fix the button_start() method that always rewrite the
date_start even if the production had already been started.

Task : 2082442

closes odoo/odoo#34038

Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-10-16 07:34:15 +00:00
William Henrotin e8a3fb9a0b [IMP] mrp: block usage of duplicate serial number
With this commit, the manufacturer will now be noticed earlier in
the process if he produced/consumed a serial number already produced/consumed in a
previous production. Before this commit, an error was triggered as
well but only at the very last step of the production.
This leaded to two issues :
 - The user had to unlock-edit-lock to update the wrong serial number
 - On large production, it was difficult to figure out which was/were
   the product(s) to fix.

The search on previous production is done each time the produce wizard is closed
or once the production is done on a workorder

Task 2002133
2019-10-16 07:34:15 +00:00
Christophe Simonis d74b451805 [MERGE] forward port branch 13.0 up to f4105eb9c7 2019-10-09 02:08:17 +02:00
Andrea Grazioso (agr-odoo) 1ac5ba040e [FIX] account,mrp,payment,purchase,purchase_stock,sale,sale_stock: studio crash on new view
Install stock and purchase. Make a RFQ for just one product, coonfirm
and receive in one transfer. Click on the delivery (should be only 1).
The picking will display. Open studio, select view, activate list view.

Javascript traceback will popup. Moreover the view of the stock
module will be altered in a faulty way (can be recovered from "Window
Actions", looking for the stock.picking action with external id
"stock.action_picking_tree_all" and removing the last added tree from
"View Mode").

This is caused by studio not detecting all the active views, thus giving
the possibility to add an already active view, because when there is just
one picking all other views are filtered out.
Changing the way the form view is retrieved in case of a single picking
fix the issue.

opw-2076241

closes odoo/odoo#38093

Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2019-10-07 13:18:20 +00:00
fw-bot d38e32c85a [FIX] mrp: avoid double write on production orders
Small improvement in order to not trigger twice the write
function on state

close #34884

closes odoo/odoo#38177

X-original-commit: d45d50b4f145a0bfb60465f7eb783a3c5fd85e6c
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-10-08 10:17:05 +00:00
Andrii Skrypka fe14321881 [FIX] mrp: check value on field
Avoid comparing bool and datetime
Fixes odoo/odoo#36435

closes odoo/odoo#37800

X-original-commit: 2af0a713d849f4a329db6d791e4565724595fe3c
Signed-off-by: Martin Trigaux (mat) <mat@odoo.com>
2019-10-02 14:59:25 +00:00
svs-odoo a4ecbdb90d [IMP] mrp: editable mrp production list view
Set also `origin` and `user_id` fields as readonly when the
manufacturing order state is done or cancel.

Task #2078163
2019-10-01 14:24:02 +00:00
Nicolas Martinelli 01c567c376 [FIX] mrp: Time Cycle computation
- Create a workcenter with a capacity of 500 units
- Create a BOM with a routing generating one work order in the WC
  created
- Create 3 MO with the following real durations:
  MO 1: 1000 units produced in 420.95 seconds
  MO 2: 1000 units produced in 120.28 seconds
  MO 3: 1000 units produced in 60 seconds
- Create a MO for 1 unit

The Duration expected is computed as

The Time Cycle is computed as:
  (420.95 + 120.28 + 60) / (1000 + 1000 + 1000) = 0.20041
The Total Expected is computed as:
  0 + 0 + (1.0 * 0.20041) * (100.0 / 100.0) = 0.20041

0.20041 seconds is not realistic based on the previous MO real
durations.

This is because the Time Cycle doesn't take into account the workcenter
capacity. If we can produce 60 units in parallel in 60 seconds, that
doesn't mean we can produce 1 unit in 1 second. Therefore, the Time
Cycle should be multiplied by the WC capacity, which gives a Time Cycle:

   500 * (420.95 + 120.28 + 60) / (3000) = 100.205

Which is much closer to the real duration.

opw-2070759

closes odoo/odoo#37548

X-original-commit: 9d3a73f64feb3b9e71c50a04adb6206b6393c757
Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2019-09-27 17:51:21 +00:00
William Henrotin 237e0b42dc [FIX] mrp: generate wo line according to move and not product
Planning workorder will generate workorder lines according to reservation
If some lines are already created into the workorder for the current product,
The line generation will increase the quantity of the existing one instead of creating
a new one. The issue occurs when the production have some stock move with the same
product.

This commit change the condition to find workorder line candidate. Instead of searching
line with same product, we now search line with same stock move.

closes odoo/odoo#37419

Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-09-25 12:18:45 +00:00
Simon Lejeune 14a50ce62f [REF] mrp: better gantt view for workorder
Implement group_expand for workcenter_id so that all workcenters are
visible in the planning by workcenter gantt.

Implement some constraint on write because anything can be moved in the
gantt view.

When changing the workcenter of a workorder, make sure the leave is now
set on the new workcenter.

closes odoo/odoo#37386

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-25 09:08:47 +00:00
Arnold Moyaux 02dfe1e8e7 [FIX] mrp: mobile byproduct BoM form view
On Mobile the byproduct One2many only empty line.
It's due to default kanban view using the _rec_name
in order to display the byproduct name. On byproduct the
_rec_name is not defined nor the field name so the kanban
is empty.

closes odoo/odoo#37403

Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-09-25 08:11:20 +00:00
Simon Lejeune e75ea301f6 [FIX] mrp: workorder operations and kit
When a BoM was composed of a phantom BoM, there was mutliple bugs:
- if not routing was set on the phantom BoM, the components were never
  consumed
- if no operation was set on the BoM, its components were to be consumed
  on the last workorder of the BoM and of the phantom BoM.

closes odoo/odoo#37304

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-25 08:05:03 +00:00
William Henrotin a25c84b9cb [FIX] mrp: ensure all quantities are filled up
Computing quantities of a kit product made only of consumable
failed as the quantities are not initialized.

This commit makes sure this kind of products don't have their quantities set up
in mrp and so are set to 0 in stock

closes odoo/odoo#37382

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-24 14:17:45 +00:00
Arnold Moyaux 49aa98ab99 [FIX] mrp: update quantity after post inventory 2019-09-24 07:45:31 +00:00
Christophe Simonis d67b2483e5 [MERGE] forward port branch saas-12.4 up to 9ed4872ea0
closes odoo/odoo#37372

Signed-off-by: Christophe Simonis <chs@odoo.com>
2019-09-24 17:45:37 +00:00
Christophe Simonis ac4fc6e7c7 [MERGE] forward port branch saas-12.3 up to bd3e510edb
closes odoo/odoo#37314

Signed-off-by: Christophe Simonis <chs@odoo.com>
2019-09-24 09:44:56 +00:00
William Henrotin 1067f3bda2 [IMP] mrp: compute quantities speedup
The computation of kit quantities was not efficient. A loop on each product
of the recordset to consider performed. Each time a product was seen as 'not a kit',
a new computation on the complete recordset was done. This leads to a N^2 complexity

This commit only compute stock quantities for non kit product in one batch

opw-2070768

closes odoo/odoo#37205

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-20 12:39:04 +00:00
Goffin Simon 88889b6aa8 [FIX] mrp: operation type defined on a BOM not chosen
Steps to reproduce the bug:
- Create two operation types OP1, OP2 with code = mrp_manufacture
- Create a BOM B with operation type = OP2
- Create a MO with B

Bug:

The operation type set on the MO was OP1 instead of OP2

Technically:

The default value was always taken from function _get_default_picking_type

opw:2070370

closes odoo/odoo#37029

X-original-commit: 3c5338dce8db7606ac2ac0101473bcafe3bd4f76
Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2019-09-18 10:03:14 +00:00
Simon Lejeune 2425c7b223 [FIX] mrp: set planned date when creating order through procurement
If it isn't set manually, it defaults to now and the result is not
consistent with planned date end. We make it an hour before totally
subjectively.

closes odoo/odoo#37173

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-19 15:03:21 +00:00
Simon Lejeune deeb17cef0 [REF] mrp: improve error message in run_manufacture 2019-09-18 07:14:53 +00:00
svs-odoo 5d75d07bad [FIX] mrp: product quantities by company
Before this commit, the product/product template computed mrp quantity
fields wasn't computed by active company but for all companies.
So, set `compute_sudo` on false for the different computed mrp quantity
fields of products and product templates to avoid to search with sudo
active and to search by company.
2019-09-13 12:25:25 +00:00
Christophe Simonis 5a273e74f0 [MERGE] forward port branch saas-12.4 up to fe59754c52
closes odoo/odoo#36721

Signed-off-by: Christophe Simonis <chs@odoo.com>
2019-09-13 13:32:51 +00:00
Christophe Simonis 9bf0b04adb [MERGE] forward port branch 12.0 up to 82a8cdd6f2 2019-09-06 17:52:48 +02:00
Goffin Simon b4a1b87fb6 [FIX] mrp: domain on field final_lot_id in mrp.production.work.order.form
Steps to reproduce the bug:

Let's consider two storable products P1 and P2 where P1 is tracked by serial number
- Create a BOM B  for P1 where P2 is a component
- Create a serial numberv SN for P1 with no quantity
- Create a MO M1 for P1 and click on button "Produce"
- In the view MRP Product Produce, SN is selectable in the field lot_id
- Now change B and set a routing on it
- Create a new MO M2 for P1 and click on produce
- At least one WO has been created, click on the first one

Bug:

- SN is not selectable in the field final_lot_id

The domain set on the field final_lot_id:

"['|', '&', ('product_id', '=', product_id), ('product_id.tracking', '!=', 'serial'), ('use_next_on_work_order_id', '=', id)]"

didn't allow to chose SN.

With this fix, it's now possible to chose SN on the first WO created for M2

opw:2059745

closes odoo/odoo#36425

Signed-off-by: Simon Goffin (sig) <sig@openerp.com>
2019-09-05 09:35:39 +00:00
Nicolas Martinelli a3f2c82789 [FIX] stock, mrp: merge SFP for 2 different MO
The condition needs to be fined-tuned, so revert for now.

This reverts commit 40487aca5c.

closes odoo/odoo#36470

Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2019-09-05 12:29:43 +00:00
Christophe Simonis 7a548569c6 [MERGE] forward port branch 12.0 up to 638eac9bae 2019-09-04 19:32:26 +02:00
Christophe Simonis 4528f75cb0 [MERGE] forward port branch 12.0 up to 82c0e9b620 2019-09-03 12:41:08 +02:00
Goffin Simon a9bb669487 [FIX] mrp: Kit in manufacturing
Steps to reproduce the bug:

- Create a MO with a product with a normal bom B
- Save the MO
- Change the type of B to phantom
- Try to produce the MO

Bug:

It was impossible to cancel or confirm the MO.
It's not allowed to produce a MO with phantom bom.

opw:2061958

closes odoo/odoo#36329

Signed-off-by: Simon Goffin (sig) <sig@openerp.com>
2019-09-03 07:38:18 +00:00
Arnold Moyaux 5f7648bb9a [FIX] mrp: failing test multi mrp step
It's due to MRP refactoring that confirm raw moves before finished
moves. It implies that in _assign picking, SFP with final product
will search a picking but the stock.move do not have a created_production_id
and it will be merged inside the intermediate SFP (it works before
because it was the intermediate SFP that was merged in the finished SFP).

_key_assign_picking is also added if multiple moves are confirmed w/
and w/h created_production_id, we won't merge them in the same picking.

closes odoo/odoo#36335

Signed-off-by: Christophe Simonis <chs@odoo.com>
2019-09-02 13:00:00 +00:00