A user should be able to scrap some products thanks to an internal
transfer.
To reproduce the issue:
1. In Settings, enable "Multi-Step Routes"
2. Create a storable product P and update its quantity (> 1)
3. Create a planned and internal transfer T:
- From: WH/Stock
- To: Virtual Locations/YourCompany: Scrap
- With: 1 x P
4. Mark T as done
Error: T is still in draft
The `_compute_state` of a picking should not ignore the scrapped moves.
However, if we include them, we need to think about this use case: a
picking with a cancelled normal move and a done scrapped move -> its
state should be cancelled (see use case and test from [1])
[1] 429b589618e8dc2b0c0ccdec3f6eed88f1c73fc8
OPW-2841190
closesodoo/odoo#90870
X-original-commit: 1c956d49b45e9d3fec2bfa2c2020ea278ea80507
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>