When a serial number SN is trying to be consumed and has been unbuilt in the past,
an evaluation is used to check that the # of times SN was unbuilt is equal to
the # of times SN was consumed. However, when counting the unbuild SN it did not take into account if
it was from an unbuild order.
opw:2510294
closesodoo/odoo#72272
X-original-commit: 47d6ff49b19e68d84a68d8c4b999cb6115398805
Signed-off-by: Simon Goffin (sig) <sig@openerp.com>