Current behaviour:
When creating a timesheet, if in the vals passed the AAL doesn't
have a company (possible since it's not required), then the `uom`
of the timesheet is False, which doesn't make sense.
Expected behaviour:
The timesheet `uom` should fallback on the uom of the company
of the project.
Steps to reproduce:
- Install hr_timesheet, Accounting
- Activate the AAL in the settings
- Create a project with an AAL
- Remove the company on the AAL of the project
- In that project create a task and log some timesheet.
- `uom` field should be empty
Reason for the problem:
When setting the `product_uom_id` in the vals when creating/writing
a timesheet, we just take the `project_time_mode_id` on the company
linked to the AAL. The problem is that the company on an AAL is not
a required field, so it can be `False`, leading the setting the val
for `product_uom_id` to `False`.
Fix:
In case the AAL has no company, we get the `uom` from the company
linked to the project.
Affected versions:
- 14.0
- 15.0
- saas-15.2
- 16.0
- saas-16.1
- saas-16.2
- master
opw-3245671
closesodoo/odoo#117834
X-original-commit: 4cce77bd0288eeb3326ba57e91ef11d436f8a0ce
Signed-off-by: Xavier Bol (xbo) <xbo@odoo.com>
Signed-off-by: Piryns Victor (pivi) <pivi@odoo.com>