Purpose
=======
In Project, the configuration has to be done twice: in the settings of the
app and on each project.
During the onboarding, the user won't understand that a feature has to be
enabled at both places and will think that the system just doesn't work.
If the user enabled a feature, he most likely intends on using it for most
of his projects. Therefore, having to do a double configuration for each
new project is annoying.
By the way, sub-tasks is the only global feature (it can't be enabled or
disabled by project), so we are breaking it down by project to remain
consistent with the rest.
Specification
=============
1/ Enable subtasks per project
Before this commit, sub-tasks were a global feature (i.e. once enabled
they were enabled for all projects). This commit gives the ability to
enable/disable sub-tasks per project.
2/ Make project_id on planning required
3/ Change default rating status on new projects
4/ Default value for allow_subtasks
5/ Enable timesheets on existing projects
6/ Hide Total Hours if subtasks are disabled
7/ Create project in the company context.
Otherwise some records generation could use a default company which is not
the company for which we want to create a project.
8/ Default value for allow_forecast, is_fsm
9/ Change reference to timesheet product
10/ Fix tracback on industry_fsm_report.
Before this commit, there was a traceback when enabling "Worksheets"
(industry_fsm_report) after "Time and Material" (industry_fsm_sale).
11/ Convert some onchange method into computed editable stored fields
closesodoo/odoo#41218
Taskid: 2146474
Related: odoo/enterprise#6998
Signed-off-by: Yannick Tivisse (yti) <yti@odoo.com>