Also, we should be able to set a customer on a project, whatever the access rights,
for example, if we're managing services by using internal projects.
- Change the widget behavior from asynchronous to asynchronous, by adding 3 related fields
on the project.task model, which are the custom labels defined for the stage
- Instead of making a rpc call, we are taking directly the labels on the parent for the kanban view,
or on the view datarecord for the form view
- There are now 2 templates for the kanban view or the form view
- The development has been backported in the community version
- The options attribute has been removed on the project_view.xml file for the kanban_state field
Move the project kanban_selection widget out of h1 and make it as
direct child of form sheet. This allows to put it on the right of
oe_title no matter what (+ enterprise compatibility).
Major changes:
- New start and expiration dates
- Remove field Contract Status
- Simplified because use of sale_timesheet
Reason: complete rewrite of the Sale module.
Responsible: fp, dbo, nim
Among a lot of views tweakings and cleaning, some changes are listed here.
product
- add currency_id, taken from the company
stock
- procurement request and inveotry adjustement wizards now correctly work
on product and templates with 1 or more variants. With one product the product
field is readonly, with a template and/or a product with variants the
product field is limited to the existing varians.
- valuation and cost method fields on the templates now come from property
fields defined on the template, or from property fields defined on the
product category. It allows to define those fields directly from the
category.Among a lot of views tweakings and cleaning, some changes are listed here.
membership
- details not visible in the default product view. However there is a specific view
to use in (membership / configuration / create member product)
Main changes :
- mail.notification model is removed. People do not receive notifications
anymore. Instead two ways of following documents exist
- using a channel; messages will be displayed on the channel itself
in a near future commit
- following with its partner; messages will all be considered as
needaction, using a new m2m table. People should receive less
needaction messages by following less records by themselves.
There is no more read / unread state anymore. Instead only needaction
messages are considered. Todo (Favorites) messages still exist, and are
stores on a new m2m table instead of using decorated notifciations.
- the main filter for documents is not message_unread anymore, but
message_needaction. A lot of views and filters have been updated
accordingly.
- the vote feature has been removed
[REM] portal_project: move ALL the things
- move portal access rights from portal_project and website_project_issue to project and project_issue
- move portal menuitems back to their respective module
- remove public visibility of projects
- adapt demo data to have a 'Demo Portal' project
- add correct access rights for account.analytic.line for portal users
- small view tweak (do not display 'timesheet' tab if one can't see antyhing in it anyway)
Project form view: some cleaning in the settings tab (use technical group, put
timing fields on the group_time_work_estimation_tasks).
Light cleaning of the tasks form view.
Light cleaning of the issues form view.
project_timesheet: timing fields put in gorup_time_work_estimation_tasks group to
be coherent with previous changes.
concept of default / common stages.
However as the link between stages and projects is still a many2many
it is still possible to have shared columns. It is however not the
standard way of using stages.
Members were not used in project, except for the now removed faces library.
Statistics can still be computed based on task or issues responsibles
instead of adding all members of a project.
Indeed you could have members that did not actually work in the project
making it difficult to differentiate with followers. Now the concept
of members is removed. Followers is sufficient for communication.
The new field will be the real date of assignation.
Don't use start_date for this purpose anymore.
Arranged fields in group to prevent view glitch
mentioned in task 19579.
- removed message_summary, a field that computes html containing the number
of unread messages. This field was used only in kanban views. Probably that
in earlier versions of the kanban view this field had a use; however now
we can directly use a counter and use it in the kanban templates.
- message_unread_counter is added, a counter of unread messages computed
in the same time as message_unread. It is now used in kanban views.
Views of several addons have been updated.
Modification summary:
KNOWLEDGE
get rid of the module Knwoledge, keep Document Management for docusign, which will be name eSign when merged
SALE/CRM
– Phone Calls becomes Calls, remove scheduled calls menuitem
– Merge Sales/CRM menuitem into Sales/Sales
– Page Views into scoring page views
– Configuration : Attribute, Attribute value in technical features
LEAD AUTOMATION
– Group Campaign and segment
– Report : Move Follow-up into it
WAREHOUSE
– Move traceability menuitems into inventory control
PROJECT
– Service, move it to Configuration, get rid of Products menu
– Invoicing : remove it, there are stat buttons, and contracts are managed in sales.
Timesheet :
– Timesheet profit, rename into Profits.
Rebasing a merge commit with a lot of conflicts is a real pain as every
non-automatic conflicts should be redo manually (especially when there
is a lot of file rename that git cannot follow)