When using AVCO and subcontracting without any additional cost, the
valuation of the finished product is incorrect
To reproduce the issue:
1. Create a Product Category PC:
- Costing Method: AVCO
2. Create two products P_compo and P_finished:
- Both:
- Type: Storable
- Category: PC
- P_compo:
- Cost: 10
- Routes: Resupply Subcontractor
3. Update P_compo's quantity: 2
4. Create a Bill of Materials BO:
- Product: P_finished
- Type: Subcontracting
- Subcontractor: a partner P
- Component: 1 x P_compo
5. In Inventory, create a planned Receipt R:
- From: P
- Operations: 1 x P_finished
6. Mark R as To Do
7. Process the delivery of P_compo
8. Validate R
9. Repeat steps 5-8
10. Open the Inventory Valuation
Error: There are two valuation lines for P_finished: one line has a
value of $10, which is correct (this is the cost of the component).
However, the value of the second line is $20, it should be $10 too.
Here are a part of the values used to generate the related MO:
https://github.com/odoo/odoo/blob/2d12fb8fb94c0f2acade7222cfedbec34114a8e9/addons/mrp_subcontracting_account/models/stock_picking.py#L21-L25
In the above case, an extra cost is defined on the MO and is based on
the unit price of the subcontracted SM. However, `_get_price_unit` will
return an incorrect value:
https://github.com/odoo/odoo/blob/251be6b943ea8c3f274bb0863d0af3f7c6b8d10d/addons/stock_account/models/stock_move.py#L39
After step 8, the standard price of P_finished is $10. Also, in the
above case, there isn't any subcontracting cost, so there isn't any unit
price defined on the SM. Therefore, `_get_price_unit` returns the
standard price of P_finished ($10). As a result, when computing the
value of the finished stock move:
https://github.com/odoo/odoo/blob/4fc2ec31861d4602357f130066ec3507b96d8dc8/addons/mrp_account/models/mrp_production.py#L39-L42
It uses the extra cost of the MO + the component cost. This explains
where the $20 come from.
OPW-2641339
closesodoo/odoo#80889
X-original-commit: 0567536f8b66c71f6860041926542f88026793b1
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
Take in account the bom consumption of subcontracting BoM:
- In flexible and warning we can now record extra component
(even if there isn't tracked component).
- In the warning case, we get a warning issue in during the recording
of component if we consume more than expected
- In case of script consumption, we cannot record component expected
if some are tracked. In this case we can consume more than expected
only if the user is a mrp manager.
Also fix "Set quantities" Button for the subcontracting
task-2486811
closesodoo/odoo#75041
Related: odoo/enterprise#20350
Related: odoo/upgrade#2750
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
- The "BoM Structure & Cost" takes now in account
the subcontracting cost.
The subcontracting cost depends of the best supplier info in product
and subcontractor register in the BoM.
- Also add this subcontracting cost (to the cost field) when we click on
"Compute Price from BoM" in the product view.
task-2486811
Part-of: odoo/odoo#75041
The license is missing in most enterprise manifest so
the decision was taken to make it explicit in all cases.
When not defined, a warning will be triggered starting from
14.0 when falling back on the default LGPL-3.
closesodoo/odoo#74245
Related: odoo/design-themes#48
Related: odoo/enterprise#19862
Signed-off-by: Xavier Dollé (xdo) <xdo@odoo.com>
In a subcontracting flow, a production order is created to reflect the
subcontractor work. An extra cost is set on this production order
corresponding to the purchase order line price unit. If the
subcontracting product is tracked, we may create some backorder to save
all the lot/serial numbers. As the extra_cost is not copied, the first
lot/serial number will have the corresponding stock valuation layer with
the correct quantity. The following ones will only have the cost of the
components as value.
closesodoo/odoo#69245
Opw: 2487450
X-original-commit: 262c2ba8773c698ccde499b095794ab0fc780699
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
This reverts commit cfd68df.
The fix was to not value the subcontracting location while it has to be
valued.
closesodoo/odoo#68499
X-original-commit: b1ba8b48f69919d18b946e4f602b9a136e835d51
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
When buying a subcontracted product, if the inventory valuation of the
product category is automated, the product delivery does not create a
new journal entry, i.e. the automated inventory valuation is not done.
To reproduce the error:
(Need account_accountant,purchase)
1. In Settings, enable "Subcontracting"
2. Create a product category PC
- Parent: All
- Inventory Valuation: Automated
3. Create a product P
- Must be storable
- In category PC
- Set a positive cost
4. Add a BoM to P
- Type: Subcontracting
5. Create a RfQ
- Vendor: BoM's subcontractor
- Product: P
6. Confirm & Receive Products
7. Go to Accounting > Accounting > Miscellaneous > Journal Entries
Error: There isn't any journal entry about the new product. This is an
error because the inventory valuation for this product is automated, so
there should be a line with the P-product and the cost set on step 3.
When validating the delivery, the server checks the stock move lines
considered as incoming:
https://github.com/odoo/odoo/blob/5098cb25accce91347760cbd2f6427c07265fa00/addons/stock_account/models/stock_move.py#L61-L65
Problem is that `_should_be_valued` for subcontractor's location returns
`True`, therefore the stock move line will not be added.
=> The `mrp_subcontracting` module needs to add a condition:
A location can be valued if it is not subcontractor's location.
OPW-2446298
closesodoo/odoo#66004
X-original-commit: beb7159980f7ed29323d99fd4b72de3fa187f455
Signed-off-by: Adrien Widart <adwid@users.noreply.github.com>
`action_done`on pickings should be a private method,
and called only trough the picking validation process.
task-1938108
closesodoo/odoo#39174
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>