The stock convention on location name is always to name the destination
`location_dest_id`. It was not the
case on the stock rule model
Task: 2648449
Part-of: odoo/odoo#80434
Add a operation type (`stock.picking.type`) for
the subcontracting resupply in order to distinct
easily the a simple delivery and a resupply to a subcontractor.
task-2486811
Part-of: odoo/odoo#75041
- nothing tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products not tracked and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
- finished products and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
due to commit 108ee65af2a88d61526dc047043138bddc3f9b63#diff-99ad190cf09687f6efdebc1f7636062c
picking type for subcontracting order use field use_create_components_lots
instead of classic picking type.
cancelling propagation in a move chain was True be default. That means,
without any configuration, a cancel move will always cancel its next ones
This commit change the default to allow only cancelation of move chain
until the stock location. Here are 2 examples :
1. Reception and delivery in 3 steps. The moves chain is the following:
Vendor -> Input -> Quality -> Stock -> Pack -> Output -> Customer
In case the Purchase order is cancelled, we want to move from Vendor to
Stock are cancelled but not the ones from Stock.
2. pbm + sam. The manufacturing process is the following;
Stock -> Pre-prod -> Production -> Post-prod -> Stock
cancelling the first move should cancelled until Production and not after
Task : 1913297
In a few words, it allows to send components to a subcontractor partner
and receive a finished product. The production is managed through classical
manufacturing orders where the raw and finished location is the
subcontracting location. When creating a receipt picking for a
subcontractor partner, the location_id of the moves will be set to the
subcontracting locations by using the property_stock_customer and
property_stock_supplier of the partner. An override of _action_confirm
will create the manufacturing order.
When a subcontracted bom contains tracking, the produce wizard is
available from the picking to record which lots were produced/consumed.
New type on the BoM: subcontract
New type on res.partner: subcontactor
New location per company (we still own the components stored at the
subcontractor so they're still valued)
New routes created to resupply the subcontracting location on order or
not (through a reordering rule).
Override of res.partner to set the property_stock_customer/supplier on
subcontactor partners.
Proper tests were added too.
Joint work with: Arnaud Baes <arb@odoo.com>
task 1831382