Commit Graph
5 Commits
Author SHA1 Message Date
Rémy Voet (ryv) e7fd2ba5c8 [FIX] mrp_subcontracting: fix flow with tracked component
After the odoo/odoo#52949 , the registering of tracked component,
in case of subcontracting, was broken. Fix and try to mimic
the same flow than before. The produce wizard has been replaced
by a clean MO form to register component and use backorder mechanisme
of MO to manage tracked finished product + tracked component.

task-2278147

closes odoo/odoo#54994

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-07-30 12:09:10 +00:00
Victor Feyens 1977f6618b [IMP] mrp_subcontracting: create stock move lines in batch
X-original-commit: e721dc6c25c52ae18aa74b3ffc4cc366b45b16f5
2020-04-02 13:53:04 +02:00
Arnold Moyaux 4055293873 [IMP] mrp_subcontracting: bypass reservation
A subcontracting receipt should be always assigned even
if the components are not deliver. It depends on the partner
and not our company.
2019-08-19 15:03:59 +00:00
Arnold Moyaux d151373941 [REF] mrp_subcontracting: views v2
- nothing tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products not tracked and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
- finished products and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
2019-08-19 15:03:59 +00:00
Arnold Moyaux 37200abfc5 [REF] mrp_subcontracting: lot produced/consumed management
Currently, the subcontract picking present multiple difficulties:
- The user has to introduce multiple time the lot produced.
In register components button and then create a new move line with
the show details operation button.
- Same problem with the correction system. The user has to modify the
lot in details operation and then go on the subcontract production and
unlock and edit it.

In order to facilitate those behavior. A move line will be automaticaly
created during the register components process. Also the subcontract
moves for components will be available in the detail operations tab.
2019-08-19 15:03:59 +00:00