Commit Graph
22 Commits
Author SHA1 Message Date
Rémy Voet (ryv) 326ae2a725 [FIX] mrp_subcontracting: fix flow with only tracked finished product
Step to reproduce:
- Create a subcontracting BoM by partner A,
for a tracked product B (by serial or lots)
- Create a incoming transfer coming from A and mark as todo.
- Fill the move with move lines with lot + quantity.
- It is impossible to validate the transfer, "You need to supply lot..."

Also at the creation of the picking a warning popover indicate that
the previous operation (the hidden MO) is set after the transfer.

These issues comes from the refactor of mrp for v14 and the part of
subcontracting wasn't complete obviously.

Fixes done:
- Rewrite the code of the `_action_done` for subcontracting. It is for
the case of tracked finished product without any tracked component,
there wasn't any code to manage that. Now manage it by backorder MO
feature. Fix the main bug
- Set finished_date_planned before the transfer to avoid the alert
popover.
- Avoid to write activity in channel about the hidden MO in case of
cancelling.
- Fix `action_record_components` to manage multiple subcontracting
products with tracked component.
- Remove the `priority` field from the wizard MO (in case of tracked
product. Also the wizard is not really a wizard, just a weird hybrid
MO form)

PR: odoo/odoo#61606
task-2357115

closes odoo/odoo#62109

X-original-commit: 1a34e46eaca14aec981dd0f162e8014c7cb0abea
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: Rémy Voet <ryv-odoo@users.noreply.github.com>
2020-11-20 16:07:14 +00:00
Goffin Simon 403c687869 [FIX] mrp_subcontracting: Error Message with partial delivery
Steps to reproduce:

- Create a product P with route 'Resupply subcontractor on an order'
- Let's consider a BOM for P with type 'Subcontracting'
- Create a PO with subcontractor set on that product and process with Qty > 1,
- Validate a receipt with partial Qty and no backorder

Bug:

An error was raised because no production_id was set when trying to create a mrp.product.produce

When function _action_done is called with cancel_backorder = True, the function _action_cancel is called on the new_move
with no backorder and it called the function _action_cancel defined on model stock.move in module mrp_subcontracting
This function called _action_cancel on the mrp.production record MP
And finally this function called action_cancel on model stock.move on all finish_moves and raw_moves of MP

This line unlink MP of finish_moves and raw_moves

move.move_dest_ids.write({'move_orig_ids': [(3, move.id, 0)]})

That's why production_id was not set

PS: In this way, we don't cancel a MO when it is still used by other moves.

opw:2322278

closes odoo/odoo#57346

X-original-commit: e4d22d390c8aa8edf757e36704a9e04b2b89f115
Signed-off-by: Simon Goffin (sig) <sig@openerp.com>
2020-09-09 10:29:26 +00:00
Rémy Voet (ryv) e7fd2ba5c8 [FIX] mrp_subcontracting: fix flow with tracked component
After the odoo/odoo#52949 , the registering of tracked component,
in case of subcontracting, was broken. Fix and try to mimic
the same flow than before. The produce wizard has been replaced
by a clean MO form to register component and use backorder mechanisme
of MO to manage tracked finished product + tracked component.

task-2278147

closes odoo/odoo#54994

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-07-30 12:09:10 +00:00
William Henrotin 0e2765f5fd [REF] mrp: no more produce wizard
Use a view similar as the pickings one.

task-2241471
2020-06-15 16:59:41 +02:00
Arnold Moyaux d39fc89324 [FIX] mrp_subcontracting: lot_id instead of lot_name in receipt
Usecase to reproduce:
- Create a subcontracted product tracked without tracked components
- Create a receipt for this product
- Click on show detail

-> Lot_id are display even if the picking type uses create lot.
The assign serial feature is not working either.

The lot_id instead of lot_name is required in case of tracked
components since it will open the produce wizard and the user
will create lot there. However in the case of non-tracked components,
the wizard will not be used nor lot created. In this case the
classic behavior should be used with lot_name

closes odoo/odoo#43997

Task: 2180191
X-original-commit: 00fe4186935435f46a0db197c68e6df956fe80db
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-01-27 12:38:13 +00:00
Arnold Moyaux ea340afafa [FIX] mrp_subcontracting: cancel a PO should cancel delivery
When subcontracting a product via a purchase order and not a simple
receipt. Then the cancelation of the receipt will not only cancel
the receipt of the finished product but not the delivery for the
components.

It happens because button_cancel on purchase order will call
_action_cancel the stock.move linked to purchase order line. It will
not call action_cancel on the stock.picking. However the part
responsible for the cancelation of components delivery is in the
stock.picking action_cancel method.

Move the stock.picking action_cancel logic in the stock.move
_action_cancel method since it's always call for both usecase.

Fixes #42551

closes odoo/odoo#42653

X-original-commit: 841305f271411c3a67af271ac09da9ce0922f100
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-01-02 18:11:33 +00:00
Victor Feyens 9215e73fa2 [IMP] * : replace with_context(force_company=c) by with_company(c) 2019-11-18 12:25:05 +00:00
Arnold Moyaux ec5e63cf80 [FIX] mrp_subcontracting: correct type for view registry
When the action is called by a javascript function the view
is not correctly rendered because the tree type does not exist
in the registry but the correct type is list.
2019-10-16 07:58:12 +00:00
Christophe Simonis d74b451805 [MERGE] forward port branch 13.0 up to f4105eb9c7 2019-10-09 02:08:17 +02:00
Arnold Moyaux 6cdaea7223 [FIX] mrp_subcontracting: Initial demand in a BO
Usecase to reproduce:
- Create a receipt with a quantity of 2
- Receive 1 and create a back order
- Receive 2 in the BO

It will only require the components for 2 units and not 3.

closes odoo/odoo#37305

Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2019-09-24 07:45:31 +00:00
Simon Lejeune d1814891fe [REF] mrp_subcontracting: manage backorder
closes odoo/odoo#37046

Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-09-18 07:15:32 +00:00
Arnold Moyaux 93c53265ed [FIX] mrp_subcontracting: multi company 2019-09-18 07:14:53 +00:00
Christophe Simonis 64e43808b7 [MERGE] forward port branch saas-12.5 up to 58a83d1222 2019-09-20 17:34:45 +02:00
Arnold Moyaux 4055293873 [IMP] mrp_subcontracting: bypass reservation
A subcontracting receipt should be always assigned even
if the components are not deliver. It depends on the partner
and not our company.
2019-08-19 15:03:59 +00:00
Arnold Moyaux a3aeabd44d [FIX] mrp: do not base default on active_id
Since active_id do not works allows to use a context
key that will not be modified magically.
2019-08-19 15:03:59 +00:00
Arnold Moyaux d151373941 [REF] mrp_subcontracting: views v2
- nothing tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products tracked
The "register components" button shouldn't appear, the receipt looks normal.
- finished products not tracked and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
- finished products and components tracked
The "register components" button appear and the burger redirects to "Produce" wizard. The user should record all the productions before being able to access SML through the burger wizard. He cannot force any SML for subcontracted products with tracked components before having recorded all the productions.
2019-08-19 15:03:59 +00:00
Arnold Moyaux 5b526e8756 [IMP] mrp_subcontracting: modify initial demand
Modify the initial demand for a subcontract receipt should
update the delivery to the subcontractor.
2019-08-19 15:03:59 +00:00
Arnold Moyaux cbea919a9a [FIX] mrp_subcontracting: access error on purchase
Usecase to reproduce:
- Validate a purchase_order with a user without group inventory user or manufacturing user.

AccessError on operation read for BoM. A purchase user should be able
to validate an order independently of the documents that will be
generate.
2019-08-19 15:03:59 +00:00
Arnold Moyaux 33cf89a6c6 [REF] mrp_subcontracting: remove partner type
Replace the type subcontractor on the partner.
Instead replace it by a property for a subcontracting location.
The purpose is to have a simplier configuration. The user would
just need to add the partner on the BoM in order to start a
subcontracting process.
2019-08-19 15:03:59 +00:00
Arnold Moyaux 37200abfc5 [REF] mrp_subcontracting: lot produced/consumed management
Currently, the subcontract picking present multiple difficulties:
- The user has to introduce multiple time the lot produced.
In register components button and then create a new move line with
the show details operation button.
- Same problem with the correction system. The user has to modify the
lot in details operation and then go on the subcontract production and
unlock and edit it.

In order to facilitate those behavior. A move line will be automaticaly
created during the register components process. Also the subcontract
moves for components will be available in the detail operations tab.
2019-08-19 15:03:59 +00:00
Arnold Moyaux abc8253448 [FIX] mrp_subcontracting: extra move correctly handle.
Usecase to reproduce:
- Create a receipt of 1 units of a subcontracted product
- Receive 2
- Validate the receipt

-> An extra move for subcontractor of 1 has been validated but a
new move of 2 still in waiting availability and can not be
validated.

It happens due to action_done that will validate existing subcontract
order (with the initial quantity). Then the move is validated and an
extra move is created and merged in the first one. This new merged
move of 2 is then confirmed and validated. That will recreate a
subcontract order of 2 that will not be validated since it was validated
in the picking action_done at the start.

This commit will modify:
- action_done on move in order to validate the subcontract order after
the move validation and the new subcontract order creation too.
- action_confirm in order to create the subcontract order with the
additional quantity and then merge it to the existing moves.
2019-08-19 14:14:13 +00:00
Simon Lejeune d91db5bde6 [ADD] mrp_subcontracting
In a few words, it allows to send components to a subcontractor partner
and receive a finished product. The production is managed through classical
manufacturing orders where the raw and finished location is the
subcontracting location. When creating a receipt picking for a
subcontractor partner, the location_id of the moves will be set to the
subcontracting locations by using the property_stock_customer and
property_stock_supplier of the partner. An override of _action_confirm
will create the manufacturing order.

When a subcontracted bom contains tracking, the produce wizard is
available from the picking to record which lots were produced/consumed.

New type on the BoM: subcontract
New type on res.partner: subcontactor
New location per company (we still own the components stored at the
subcontractor so they're still valued)
New routes created to resupply the subcontracting location on order or
not (through a reordering rule).
Override of res.partner to set the property_stock_customer/supplier on
subcontactor partners.

Proper tests were added too.

Joint work with: Arnaud Baes <arb@odoo.com>

task 1831382
2019-04-03 13:52:22 +00:00