Usecase to reproduce
- Create a KIT with COMP A (15$) COMP B (25$)
- Enable Margin on SO
- Set the cost on the KIT with compute cost button (40$)
- Create a quotation with the KIT (cost is correct 40$)
- Confirm the quotation -> Cost is updated to 15$ (first component)
It happens because the function to compute the average price doesn't
expect a kit and compute everything from the valuation layer of first
component
opw-2413246
closesodoo/odoo#65301
X-original-commit: 827f65f70634ba7a2e4175f20e5301e514ada0a0
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Currently when unbuild a MO, we create journal entries the same as
receiving components (add credit to input account) and deliver
finished product (add debit to output account). But since the
unbuild is just a revesal of the MO, the journal entries should
alse be revesals.
In this commit, when unbuild a MO, for the journal entry about the
component change, we add credit to the output account, and for the
journal entry of the finished product change, we add debit to input
account make sure the journal entries are also reversals.
Task 2312828
PR #58150closesodoo/odoo#60730
X-original-commit: 83a3230706e1e2f4eaf9718156647821341d192b
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Use _for_xml_id to replace all the self.env.ref().read()[0]
This has the advantage of having a single point of control and to add
the fields filtering and model verification.
Add sudo for other operations on ir.actions.*
Now, by default, a Bill of Material have a flexible
consumption instead of strict consumption. Also
add new consumption choice: a flexible consumption
but with a warning when the bom isn't respected.
Also, now, the strict (a new warning option) consumption
is checked only when we try to mark as done the MO.
task-2241471
Allow to "backorder" a production, meaning create another manufacturing
order with the quantity remaining to produce. We also use the
reservation of the first order on the next ones by using
`post_inventory` on the first one and moving the newly created stock
moves to the backorder.
We introduce a wizard similar to the one in stock.
Backorders have a sub-sequence.
Backorders are linked together through the procurement group.
We allow creating a backorder even if workorders are running by closing
them, the backorder will call `button_plan` and create its own.
task-2241471
Set the operations directly on the Bill of Material.
Duplicate the demo data where a routing was shared.
Adapt the tests.
Remove the following feature:
- set the same routing on parent and kit child bom
- when planning, if the component of the kit have the same operation
than a component of the parent bom, merge these operations
task-2241471
missing bit from rev[0] and [1]
[0] 7ef11e3
[1] d6c8c34ef6539dad110f1e502eaee2c03d968797
closesodoo/odoo#42621
X-original-commit: 5096e724643ca77568ce2f09a40b138561f4c20f
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
The valuation stat button was shown only at validation of the manufacturing
order. If an intermediary inventory is posted. A part of the stock moves
are validated so some stock valuation layer are generated.
This commit shows the valuation button as soon as some valuation layers
are linked to those validated stock moves.
Task : 54665
X-original-commit: 7f67af93299c449ba80489a84ed0b13930edff90
Overwrite the method ``write`` of the model ``product.product``.
When we write on ``standard_price``, if
- the context key ``disable_auto_svl`` is not set
- the ``cost_method`` is not "fifo"
We automatically compute ``stock.valuation.layer``
(before we needed to manually call ``_change_standard_price``)
Task #2031422closesodoo/odoo#41265
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
When marking as done a MO, we use SUPERUSER to create analytic line
as an MRP user does not always have access to analytic items. There
is however a default value for company analytic line defined to the
user's context company, so we need to use the current company of the
real user instead.
closesodoo/odoo#39209
X-original-commit: 14aade9341bf9d61cd21de948755fc339ae512ea
Signed-off-by: Alex Tuyls <alt-odoo@users.noreply.github.com>
A finished move is considered as an incoming move and will pass by
_create_in_svl. We thus compute the price_unit that will be set on the
valuation layer.
We also set a stat button on the MO displaying the valuation
layers, similar to the one on the picking.
task-1875873
Multi is the default api for methods, it is not necessary to explicitly
decorate methods with it, adds clutter and most people use it because
they see that the rest of the code uses it.
Done with `find . -type f -name '*.py' | xargs sed -i '/@api.multi/d'`
This is a preliminary work to handle the price of subcontracting. We put
this field in the generic `mrp_account` module because we also want to
support adding an extra cost on a finished move without having to work
with the wokorders, on a future task.
task 1831382
Merges mrp_bom_cost into mrp_account since they have both the same
depedences.
Task #1964809closesodoo/odoo#32722
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>