This removes the procurement.order model. To fufill their needs SO, PO, MO and
stock moves now call the _run method of the relevant procurement.group.
This mecanism is now only used for stockable product, tasks now uses their own
independent mecanism.
The _run method will check all the applicable rules and create directly the
needed model to fufill the need.
The modules stock, purchase, mrp, extends the _run method to implement their
specific strategy relevant for the rule type they define.
If an exception happens the message will be logged as a mail messsage on the
source model, for example, if a sales order cannot be fufilled the salesperson
will now see directly the reason.
OLD commit messages:
[WIP] procurement: removing procurement.order in stock, sale, purchase, sale_stock. WIP
fixup! [WIP] procurement: removing procurement.order in stock, sale, purchase, sale_stock. WIP
[IMP] Basic tests
[FIX] test not necessary anymore
[FIX] remove unnecessary print statement
[FIX] unnecessary test + why passing warehouse worked before?
[IMP] purchase: one move by purchase order line
[FIX] purchase: correct inventory tests and pass move_dest_ids among procurements
[FIX] because of bad cherry-pick merge
[IMP] make mrp pass by adding move_dest_ids there too
[IMP] tests of sale_mrp, no need for cancelpropagation then
[IMP] better to consistently use recordsets also for one2many
[FIX] purchase_requisition
[FIX] Exceptions should trigger errors, which should be caught in the tests
[FIX] sale_mrp: remove usage of procurement.order and use sale order name instead of sol
[FIX] stock_dropshipping: add sale_line_id on purchase_line_id
[FIX] Remove pdb
[IMP] add stock_dropshipping files
[IMP] stock: search carrier through sale line instead of procurement group
[IMP] add procrule test and preision needed when updating sol
[FIX] sale_order_dates + [IMP] procurement exceptions by scheduler
[FIX] No need to return task
[IMP] move file as name changes and add corrections
[FIX] Continue Run Schedulers wizard fix
[FIX] name issues of takss
[FIX] updating sale order line, but there is still a problem with the recompute
Currently there is no default resource calendar. This leads to calendar
being rarely used as it is not clear how to define them and how to use
them. Moreover some code handle default-like calendar by trying to
use 8-16 work hours; this should be replaced by having a real default
calendar.
This commit replaces the demo calendar by a real data calendar. It will
soon be used as default everywhere a resource calendar can be defined.
Future improvements will come to make resource easier to use and clean
its API. This commit is only the beginning !
Several modules defines records with the external ID `base.foo_bar` while it is
created inside this module (typically menus and groups).
While there is no technical reasons to do so but this may introduce issues:
- these records will not be deleted during uninstall
- if a language is loaded before the installation of the module, it won't be
translated
The uninstallation will only remove the records with an external id linked to
this module (these would only be removed when removing base).
Installing a language before the module will drop the translations not linked
to an existing external id (as it can not be resolved).
This commit correct all the external ids tagged as from base or other incorrect
modules.
This commit contains the core of the new MRP. It contains a whole refactoring
of the MRP application, with improved and new features, written in new API.
Among other here are the main manufacturing workflow improvements :
- Picking type not only for pickings but also for manufacturing orders
- Properties replaced by picking type
- BoM can only be produced with its routing (no other)
- Either produce without routing with only production orders, or produce with
routing
- By default, there is an order in the work orders (serially), but you can
override it to be able to work in parallel
- Time clocking on work orders and block time on work centers with reporting
on OEE, performance, losses, ...
- Real-time adaptation of timings on operations
- Lots/serial numbers can be inputted like in the pickings on manufacturing
orders. It is also possible to input them in the work orders.
- Material availability independent of production order state (possibility to
start production when only part of it is there)
- Work sheets on work orders
- Put messages on work orders to make your workers pay attention to something
- Full traceability link to see for each produced piece of stock, the
consumed pieces, ...
- Separate scrap object (a scrap is not done based on an original move
anymore)
- Separate unbuild system (if you want to unbuild into its original
components)
Thanks to all people that helped during this development, notably but not
limited to Chirag A Dodiya (cod@odoo.com), Gaurav Panchal (gan@odoo.com),
Jignesh Rathod (jir@odoo.com), Mansi Trivedi (mtr@odoo.com), Pariket Trivedi
(ptr@odoo.com).
Split files and move them according to the new API guidelines. Containing
- mrp splitted into its main models and files
- stock code moved into its own models and files
- various renaming