Commit Graph
212 Commits
Author SHA1 Message Date
Nimesh Jethva 2c1549cc59 [IMP]tools, technial modules: Improvement in model description
Purpose of this commit is to give description more "business oriented"
because those descriptions appears in Odoo Studio which is supposed to be used by end users, not only by developers.

Related Task ID : 37311
2018-09-21 11:45:15 +02:00
Christophe Simonis a0901237f2 [FIX] calendar: correct recurring date timezone conversion 2018-09-14 17:23:29 +02:00
Christophe Simonis 9c77066f34 [MERGE] forward port branch saas-11.4 up to 6c103589c1 2018-09-14 16:00:17 +02:00
Christophe Simonis f3fa5a5ef7 [MERGE] forward port branch saas-11.3 up to 1e0a92c996 2018-09-13 19:30:33 +02:00
Christophe Simonis 2b92f04289 [MERGE] forward port branch 11.0 up to cf7cb147f2 2018-09-11 19:50:13 +02:00
Nicolas Lempereur 3d09560ffc [FIX] calendar: keep recurring after edited one
Since 76b7242 if we have a recurring event with 3 occurences:

 [4th 4:00-4th 5:00] [14th 4:00-14th 5:00] [24th 4:00-24th 4:00]

And we detach the first one to modify it, then when getting the
info of reccurring events not detached the system get:

- starts: [14th 4:00] [24th 4:00]
- stops: [4th 5:00] [14th 5:00] [24th 5:00]

And wrongly apply the current filtering over:

 [14th 4:00-4th 5:00] [24th 4:00-14th 5:00]

So the issue hides recurrences of event wrongly if:

- they have not been detached
- they don't have a duration of 0
- one or several previous events have been detached
- the stop date of the nth previous event occurrence (nth equaling
  number of detached previous events) is not in the current filtering.

With this change, the stops are also filtered based on start of
occurrence + duration.

Without the change, the added test fails with:

 False != '27-20120301120100' : Last event should be found searching it by date range

note: 11.0 version of 10.0 #26887

opw-1866151
closes #26901
2018-09-11 16:27:58 +02:00
Christophe Simonis 68d36512ef [MERGE] forward port branch saas-11.4 up to d78f23df84 2018-09-07 20:20:45 +02:00
Christophe Simonis 49c3264ce0 [MERGE] forward port branch saas-11.3 up to 4850fb0838 2018-09-07 14:43:48 +02:00
Christophe Simonis f19e6ce561 [MERGE] forward port branch 11.0 up to 213759b03e 2018-09-05 18:52:27 +02:00
David Beguin ec801b5436 [FIX] calendar : all day event Date to Datetime error
- calendar.event.start and stop are expecting datetime and not date.
Now, if 'All Day' event, start time = 00h00 and stop time = 23h59m59s
- when switching from all day event to not all day event, due to
stop time = 23h59m59s, the rounding for duration leads to make the stop
pass to the next day (00h00). each time you switch between all day and
not all day, the duiration is incremented by 24h.
We remove 1 sec to event stop time to avoid this.
2018-09-05 15:22:50 +02:00
jem-odoo a6401391ed [FIX] fields: raise when setting aware datetime
Now that Date/Datetime fields use python naive datetime, we want
to prevent developper to call  or assign aware datetime to
fields. Moreover, if so, the timezone will be stored in the
database, but when reading Datetime fields, we expect naive datetime.
Comparing naive and aware datetime objects leads to errors.

This commit forces developpers to use naive datetime when saving
data in database.

As example, we have to erase the timezone of dates in calendar
modules. We also regroup the 2 assignations in one call to
`write` for performance reason.

Thanks to @dbeguin and @RomainLibert for spending some time
on this bug.
2018-09-05 15:05:33 +02:00
XavierDo 0c07ff7f41 [FIX] calendar: allow search on message_ids
When fixing calendar search for recurring events we assumed that
no autojoin field will be used in this search.

The filter unread messages is based on message_ids from mail thread.
The solution here is to redefine this field in calendar to remove the autojoin.
2018-09-03 11:11:39 +02:00
XavierDo 641fe7f34f [FIX] calendar: only make leaf evaluation when necessary
A little optimisation to avoid one more query when we have no
recuring event, and only evaluate leaf of recuring event.
2018-09-03 11:11:39 +02:00
Nicolas Martinelli 93a586be7c [FIX] calendar: recurring events
Do not parse the rule with `rrulestr`, because converting back to string
will change the original rule.
2018-08-30 09:04:23 +02:00
Raphael Collet 5701d93624 [FIX] *: decorator returns on message_post 2018-08-23 17:01:22 +02:00
Christophe Simonis 4f62d6dd8f [MERGE] forward port branch saas-11.4 up to ef6b574eda 2018-08-22 12:02:30 +02:00
Christophe Simonis ef6b574eda [MERGE] forward port branch saas-11.3 up to 6cc7d3f945 2018-08-21 18:48:13 +02:00
Christophe Simonis 70d0148d0d [MERGE] forward port branch 11.0 up to fbfb91799e 2018-08-21 16:58:17 +02:00
Christophe Simonis fbfb91799e [MERGE] forward port branch saas-15 up to 9cf0dbe226 2018-08-21 16:00:40 +02:00
Christophe Simonis e80f853ab3 [MERGE] forward port branch saas-14 up to aafa6e38c4 2018-08-21 12:06:23 +02:00
Christophe Simonis aafa6e38c4 [MERGE] forward port branch 10.0 up to 342d037373 2018-08-21 11:33:53 +02:00
Nicolas Martinelli b4cbf0bb61 [FIX] calendar: date start
When creating and editing a new calendar.event record from the calendar
view, the start_datetime field does not prefill from the day that was
selected on the calendar.

Introduced in e08f999468

opw-1875276
2018-08-17 13:38:32 +02:00
Christophe Simonis 7499b47ffa [MERGE] forward port branch saas-11.4 up to edd586002e 2018-08-10 13:37:21 +02:00
Christophe Simonis 7717f082c0 [MERGE] forward port branch saas-11.3 up to af35aea6b0 2018-08-09 19:33:32 +02:00
Christophe Simonis 33e7479865 [MERGE] forward port branch saas-11.2 up to d7e2c767ce 2018-08-07 13:59:40 +02:00
Christophe Simonis d7e2c767ce [MERGE] forward port branch 11.0 up to 3513e599a7 2018-08-07 13:58:20 +02:00
Nicolas Martinelli b37416376b [FIX] google_calendar: rrule crash
Consider the following:
``` python
from datetime import datetime
from dateutil import rrule
import pytz

dt = pytz.UTC.localize(datetime(2016, 9, 2, 15, 42, 43, 205))
rset = rrule.rrulestr('FREQ=WEEKLY;INTERVAL=2;BYDAY=SU,FR,SA', dtstart=dt, forceset=True, tzinfos={})
test = [d for d in rset]
```

This will generate the following error:
```
Traceback (most recent call last):
  File "<stdin>", line 1, in <module>
  File "/usr/lib/python2.7/dist-packages/dateutil/rrule.py", line 1164, in _iter
    advance_iterator(ritem)
  File "/usr/lib/python2.7/dist-packages/dateutil/rrule.py", line 1091, in __next__
    self.dt = advance_iterator(self.gen)
  File "/usr/lib/python2.7/dist-packages/dateutil/rrule.py", line 649, in _iter
    date = datetime.date.fromordinal(ii.yearordinal+i)
ValueError: year is out of range
```

If such an event is received from Google Calendar, the synchronization
crashes. To avoid this, we enforce a `COUNT` condition if the latter or
`UNTIL` is not explicitly specified. This gives:
``` python
rset = rrule.rrulestr('FREQ=WEEKLY;INTERVAL=2;BYDAY=SU,FR,SA;COUNT=100', dtstart=dt, forceset=True, tzinfos={})
```

Note that this was supposed to be fixed in
https://github.com/odoo/odoo/blob/9dcc32c3041e7ad3549a09c5ed68ee3ef22c7a26/addons/calendar/models/calendar.py#L1287
However, this was working with the old API. The new API and its computed
fields does something different:

1. create the calendar event with the provided `rrule`
2. trigger the inverse method `_inverse_rrule` => `count=100` is added
   to the computed parameters
3. however, doing so won't recompute `rrule` for obvious reasons (it was
   the initial value provided, so we don't recompute it)
4. the crash is met in `_get_recurrent_date_by_event` when using
   `self.rrule`

The fundamental issue is that `_inverse_rrule` is not strictly the
inverse of `_compute_rrule`.

Fixes #25189
opw-1861658
2018-08-07 09:02:44 +02:00
Christophe Simonis 32dce83618 [MERGE] forward port branch saas-11.3 up to ff80efd71e 2018-08-06 19:59:53 +02:00
Raphael Collet 960360afe4 [REF] *: use native date/datetime for Date/Datetime fields
From this commit onwards, Date fields will return datetime.date objects and Datetime fields will return datetime.datetime objects, this implies a number of things that are clearly explained both in the ORM API for master.

This commit also introduces a number of helper functions for dates and datetimes that are exposed in tools.date_utils and fields.Date[time], explained in the documentation as well.

Task-ID: 47189
2018-08-06 14:37:19 +02:00
Christophe Simonis 427f717d18 [MERGE] forward port branch saas-11.2 up to 932b229941 2018-08-06 13:44:01 +02:00
Christophe Simonis 932b229941 [MERGE] forward port branch 11.0 up to b29e053436 2018-08-06 11:46:10 +02:00
Lucas Perais (lpe) efa7f87cc8 [FIX] calendar: event from activity strip text from html
From a SO (for example), create an activity with type meeting
Create the calendar event

Access it as a guest with the route with the token

Before this commit, there was an error 500 because the description
of the event actually contained "\n" and was not parseable

After this commit, we strip the string at event creation, and no error occur

OPW 1867283
closes #25795
2018-08-06 09:31:06 +02:00
Raphael Collet 896e36edab [REF] *: adapt create to work in batch 2018-07-24 16:58:14 +02:00
Pratima Gupta 8915223517 [IMP] calendar: make templates more modern and updated with Odoo guidelines
In this commit we improve templates used in calendar. Purpose of this commit
is to have templates that embed or use standard Odoo email layouts to make
them look modern and have a common style across all emails.

Main guidelines

 * better use of div / p / br to try to lessen layout issues, especially
   when updating templates using the editor;
 * correctly sequence the templates fields definition;
 * correctly set templates values notably auto_delete and user_signature
   fields to avoid confusion;
 * correctly layout the email content using light notification email. It
   can either propagate the layout choice through various send mail methods
   or directly embed the styling in the templates for more technical or
   complex templates;
 * use email_formatted computed field when possible to avoid having hand-made
   from / to addresses;
 * fix various typos and improve subjects when necessary;

Content of emails is not necessarily updated as the purpose of this task is
about styling, not content itself.

This commit is linked to task ID 1843136 (and 1868112) and to PR #25412
(and #25889).
2018-07-24 15:33:22 +02:00
Pratima Gupta b65329270f [IMP] calendar: update registration model description
This new name is much easier to understand and nicer on emails you receive
by Odoo.

This commit is linked to task ID 1843136 (and 1868112) and to PR #25412
(and #25889).
2018-07-24 15:33:22 +02:00
Christophe Simonis 8285630ad2 [MERGE] forward port branch saas-11.3 up to 609491ad0e 2018-07-13 17:12:07 +02:00
Christophe Simonis f3929aa0f7 [MERGE] forward port branch saas-11.2 up to 87dadc5bc8 2018-07-13 14:32:05 +02:00
Christophe Simonis c952a11770 [MERGE] forward port branch 11.0 up to 6e6e3d4c96 2018-07-13 10:47:18 +02:00
XavierDo 1b323e8b17 [FIX] calendar: fix attendee status filter
An event was shown in today's meeting if another attendees wasn't
in decilned state, even if the current user declined the event.

Task: #1858076
PR: #25544
2018-07-11 10:11:14 +02:00
XavierDo dea80d7c9c [FIX] calendar: take user timezone into account for todays meeting
The end of day depends of the user timezone.

Task: #1858076
PR: #25544
2018-07-11 10:11:14 +02:00
XavierDo f74f5edc77 [FIX] calendar: correct domain computation for recurring events
The custom computation for domain applied on recurring event
was assuming that a leaf value was true. This can lead to miscomputation.

Context:
For a domain like
'|',
	('start', '>=', '2018-06-28 23:59:59'),
	('allday', '=', True),

the domain will be transformed into
'|',
	'|',
		('start', '>=', '2018-06-28 23:59:59'),
		'&',
			('recurrency', '=', 1),
			('final_date', '>=', '2018-06-28 23:59:59'),
	('allday', '=', True],
In order to fetch recurring event with date that COULD match the domain.

Then, the custom evaluation will filter the generated virtual ids with
the base domaine, replacing leaf not specific to bounds by true,
leading to a domain like:
'|',
	('start', '>=', '2018-06-28 23:59:59'),
	True,
Also well known as "True"
Therefore, all recurring event virtual ids will be kept.

Solution:
This fix proposes to fetch the leaf values from the database to ensure
the consistency of the domain.

Thanks to RLI for the help.
Task: #1858076
PR: #25544
2018-07-11 10:11:14 +02:00
Christophe Simonis e354142ce7 [MERGE] forward port branch saas-15 up to c22e479246 2018-07-10 13:21:06 +02:00
Christophe Simonis c22e479246 [MERGE] forward port branch saas-14 up to 5d8076c842 2018-07-10 12:22:55 +02:00
Christophe Simonis 5d8076c842 [MERGE] forward port branch 10.0 up to 5e682451cb 2018-07-10 11:30:59 +02:00
RomainLibert e08f999468 [FIX] calendar: add onchange on start_date and stop_date
When creating an event using the list view, no value is set in the
fields start and stop.

If selecting all day, we could only change the value of start_date and
stop_date which does not change the value in start or stop.

This makes it impossible to create an event from the list view.

This problem is not present in the calendar view since this view sets a
value in start and stop, and the start and stop are recomputed via the
inverse fields.

Closes #25680
2018-07-10 11:14:16 +02:00
Christophe Simonis c8bb02141d [MERGE] forward port branch saas-11.3 up to 3cdcbce93c 2018-06-28 19:01:52 +02:00
Christophe Simonis 40836194c2 [MERGE] forward port branch saas-11.2 up to 12ddec3a76 2018-06-27 13:41:00 +02:00
Christophe Simonis 68326b15f9 [MERGE] forward port branch 11.0 up to c5ed372970 2018-06-21 12:18:40 +02:00
Christophe Simonis c5ed372970 [MERGE] forward port branch saas-15 up to 152d42041e 2018-06-21 10:57:42 +02:00
Christophe Simonis 152d42041e [MERGE] forward port branch saas-14 up to e4663523b9 2018-06-20 18:48:06 +02:00