A subcontracting BoM sometimes shows negative values in Overview, if
components are available in subcontractor's location.
closesodoo/odoo#144702
Task: 3607854
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Current Behavior:
Traceback when printing the BOM overview.
Expected behavior:
Generates a PDF of the BOM overview even if the information displayed
is entirely relevant.
Steps to reproduce:
Inventory > Configuration > Products > Attributes
Create an attribute with Variants Creation Mode set to "Dynamically".
Create a new product with this single attribute and multiple values.
Create a BOM for this product with BOM Type set to "Subcontracting".
Print the BOM overview.
Cause of the issue:
Creating such a product generates a 'product.template' that is not
associated to any variant and hence does not correspond to any
'product.product'. As a result the function_get_bom_data made can not
apply the method _select_seller properly in that case.
Notes:
- There is no error if a variant was manually created for that product.
- If the Variants Creation Mode set to "Dynamically" a variant is still
automatically created to be associated to the product tempalte so
that the erro does not rise.
Fix:
As the _select_seller method is only defined for product.product
and not for product.template, we can not not apply it here.
Furhtermore, since the additional informations provided by the
override of the method get_bom_data in the the BOM overview will
not be relevant without the existence of a variant, we skip this part of
the code when the argument of _select_seller is not valid.
opw-3698050
closesodoo/odoo#156346
X-original-commit: b983026f004d4958d2a47a0dac9b1b54e24ab04c
Signed-off-by: Arnold Moyaux (arm) <arm@odoo.com>
Signed-off-by: Lancelot Semal (lase) <lase@odoo.com>
Before this commit when duplicating a warehouse, its operation types (picking.type)
wouldn't get copied. This commit ensures that new picking.types are created for
the duplicate warehouse.
[Reproduce]
- run odoo 17 with -i stock,mrp_subcontracting
- in Inventory/Configuration/Warehouses Duplicate a Warehouse
- Bug: in Inventory/Configuration/OperationTypes picking types aren't duplicated
opw-3674614
closesodoo/odoo#151769
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
To reproduce the issue:
1. Create a subcontracted product P
2. Create and confirm a planned transfer with 10 x P
3. Set the done quantity to 8
4. Set the done quantity to 7
5. Open the detailed operation (i.e., the MO)
Error: The producing quantity of the MO is 1, it should be 3
When setting a smaller done quantity than the demand (step 8), we
update the expected quantity of the related MO, we set its producing
quantity, and we create a backorder.
When decreasing the done quantity, we update/cancel the related
productions. But here is the issue: in the above case, we simply
decrease the expected quantity of the backorder, so we just lose the
cancelled quantity, the user "can't" produce this quantity anymore.
In such situation (when decreasing the done quantity), we should
consider the last production (i.e., the last backorder) as the WIP one.
So, we should update/cancel the other productions and increase the
expected quantity of this last backorder, so the user can produce it
again.
OPW-3557632
closesodoo/odoo#142513
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Quentin Wolfs (quwo) <quwo@odoo.com>
To reproduce the issue:
1. Create a subcontracted product P
2. Create and confirm a planned transfer with 10 x P
3. Set the done quantity to 15
Error: The demand becomes 15
When setting the done quantity, we sometimes have to update the
demande (see [1]), but it should only happen with immediate transfer.
[1] 005b51fe019dfe3f7df25aefaca04a77bd5250aa
OPW-3557632
Part-of: odoo/odoo#142513
This reverts commit a32778d2b24af2774057f5428c53291653ddc6d3, as it was
a temporary fix in wait of the larger one included in this PR.
Task-3383596
Part-of: odoo/odoo#142513
Steps to reproduce:
- Create a subcontracted BoM for a product
- Create a planned reception for this product, with a demand of 10, mark
it as todo.
- Click on the moves details and in the 'Subcontract' wizard, set the
quantity to 5 and click 'Continue'.
- Now set the quantity to 2 and click 'Record Production'.
- Close the wizard without recording the last quantity.
- Validate the picking (there should be only 7 out of 10 quantity done),
and don't generate backorders.
- When checking the related Subcontracted MO (Inventory Overview ->
Filters -> Archived -> Subcontracting), all 3 MO related to this
reception were cancelled.
Issue:
When checking for the still active_productions, it wasn't taking into
account that there could be multiple still-active productions (like when
a production is recorded in multiple times like here). This messes up
with the 'in' condition, cancelling productions that shouldn't be.
Task-3383596
Part-of: odoo/odoo#142513
Steps to reproduce:
- Manufacturing -> Configuration -> Settings -> Enable Subcontracting
- Proudcts -> Bill of Material
- Create a 'subcontracting' BoM for tracked (serial) product A from
supplier S
- Inventory -> Overview -> Receipts -> New planned transfer
- Set S as 'Receive from', A as product with qty 2 and hit save
- Open move details and record both serials.
- Now open the move details again and change one of the two move lines
lot_id to a new one and validate.
Issue:
Updating the subcontracted move's move.line `lot_id` won't change the
subcontracted MO. Which means that the link is lost between the picking
and the productions, breaking the chain in traceability.
When updating to a valid `lot_id`, now checks if there's a related
production that match the old `lot_id` to keep consistency.
Task-3383596
Part-of: odoo/odoo#142513
Steps to reproduce:
- Manufacturing -> Configuration -> Settings -> Enable subcontracting
- Products -> Bill of Material
- Create a 'subcontracting' BoM for product A from supplier S
- Inventory -> Overview -> Receipts -> New planned transfer
- Set S as 'Receive from', A as product, 10 for demand and hit save
- Set 5 in the move's `quantity_done`
- Open the move details and try to record the qty, it's still possible
to record all 10 finished quantity
- If set to full quantity and saved, the move quantity will now be 15.
Issue:
In the case of a subcontracted move, only modifying the move's
`quantity_done` doesn't do much, as recording the components will add
the new `qty_producing` to the existing move's `quantity_done`, leading
to incorrect amounts if both are used.
The proposed solution here is to emulate what's done in the form when
updating the `quantity_done` of a subcontracted move. This is true also
for the generation of lot/serial numbers for the finished products, as
it would be done from quickly validating a MO through the form view.
The checks for lot/serial of component and finished products were moved
in the picking `_action_done()` rather than on the wizard itself.
This allows to set consumption of tracked components without giving a
lot, but still requires them to be set at final validation. The lots can
be assigned through the 'Register components for subcontracted product'
button.
By doing this both methods could be used correctly.
Task-3383596
Part-of: odoo/odoo#142513
Steps to reproduce:
- Manufacturing -> Configuration -> Settings -> Enable subcontracting
- Products -> Bill of Material
- Create a 'subcontracting' BoM for product A from supplier S
- Inventory -> Overview -> Receipts -> New immediate transfer
- Set S as 'Receive from' and A as product and hit save.
Issue:
A warning appears next to the scheduled date saying the preceding
operation (the subcontracted MO) is scheduled from one hour later than
this picking. This only happens for immediate transfers.
When picking's `_set_scheduled_date()` is called, this ultimately leads
setting the subcontracted MO's date planned/finished to that same date.
But since the `date_planned_finished` is implicitely readonly, its value
is recomputed right after it was set, as it depends on
`date_planned_start`, which was updated at the same time.
Also, in case of subcontracted MO, the `date_planned_finished`, the
start and finished date are usually the same, so there's no need to add
the default 1 hour between the two dates. It's done at the creation for
subcontracted MO, but any update would recompute the date to start + 1
hour and raise an useless warning on the subcontracted picking.
Task-3383596
Part-of: odoo/odoo#142513
The rational is:
Currently we have 2 columns. One for reservation, the other
for quantity picked.
However in real time, either you follow the reservation and everything
goes well. Otherwise you pick something else. In the case where you
pick somewhere else than reserved, you would like to modify the
reservation to have something similar and free the quantity you
didn't pick and expect the system to not suggest the ones you took.
In other hand, we always want to have the reserve quantity similar to
the done.
On top, having two columns could be confusing for the end user.
The cons:
-The qty_done column could be use during the picking, to
remember if something has been pick or still to pick.
- For some flow (put in pack), it's easier to write a part of the quantity to pack
and still want to reserve the full amount of product.
We goes back and choose a ligther interface over complex feature.
Changes:
Qty done and reserved qty are merged into a single column.
A new checkbox on the move exists to mark it as picked or not
Since the reservation always follow the quantity, it's now possible
to have more reserved quantity than stock. However the system will
never propose it and the inventory showing reserved > quantity should
be a warning.
The system should never modify a move that has been picked. We don't
want to overide the user action.
Regression:
Not able to pick a single stock.move.line
closesodoo/odoo#137864
Related: odoo/enterprise#48709
Related: odoo/upgrade#5310
Signed-off-by: Arnold Moyaux (arm) <arm@odoo.com>
This commit replaces the opening of the stock moves detailed operation
wizard by the one2Many record preview. This means creating a move in a
picking is still done via a new line but the edition is done via the
`fa-list` button that open the record in the web client. The goal is to
reduce the RPCs call as much as possible. The stock move lines data are
stored in the stock move record until the picking save.
Additionally, this commit change a bit the immediate transfers flows.
The stock move show only initial demand (`product_uom_qty`) but the
column wording is still "Done". In the detailed operation view, the
stock move line `qty_done` is displayed as "Reserved".
At picking validation, the user is expected to enter the same quantity
in `product_uom_qty` and `quantity_done`. If `product_uom_qty` is equals
to 0, the done quantity is used as actual transfer quantity. If
`product_uom_qty` is different than 0 but small than the done quantity,
an error is raised.
Task: 3256447
Part-of: odoo/odoo#124409
On the backorders, the consumed quantities are incorrect.
To reproduce the issue:
1. Create two products:
- C01: consumable
- P01: storable
2. Create a BoM
- Product: P01
- Type: Subcontracting
- Subcontractor: S
- Components: 1 x C01
3. Create and confirm a planned receipt:
- From: S
- 10 x P01
4. Set the done quantity (directly on the tree view) to 1
5. Validate + Backorder
6. On this first backorder, set the qty to 2
7. Validate + Backorder
8. Validate the second backorder
9. Inventory > Reporting > Moves History, filter on C01
Error: There are three SMs, and here are the done quantities: 1, 9
and 7. The second one is incorrect, it should be 2 (see step 6).
Since [1] the done quantity is always editable on the picking's
operations, but the feature is not implemented in subcontracting,
therefore the communication between the MO and the picking does not
work well. For instance, step 4: save the done quantity and open the
MO: nothing changed on it, its producing qty is still zero. Another
example: step 4, instead of setting the done quantity directly on
the picking, open the wizard (the MO), record 3 produced products and
close the wizard. The done quantity of the stock move is 3 but the
user can still edit it. However, if he tries to update the line,
nothing will change on MO side.
On top of these "little" bugs, it may lead to a more important one
as shown in the above use case. Step 5: at some point, we split the
MO to generate a backorder for 9 x P01:
https://github.com/odoo/odoo/blob/c47e4ac7cb5fdd690f40ab2e0f8d022ba565145e/addons/mrp_subcontracting/models/stock_picking.py#L72-L76
And, as shown, the flag `set_consumed_qty` is set to `True`. As
explained in the method description:
https://github.com/odoo/odoo/blob/a2574b45aef1ff6ff3a221b996d0bb0dda2a8c74/addons/mrp/models/mrp_production.py#L1602-L1603
So, because of this flag, the method will create a SML for C01 on
the backorder, with its done quantity set to the reserved one: 9.
However, back to the first block code: `move.move_line_ids` only
contains the SML created at step 4 (i.e., the SML of the inital
SM, with a done quantity equal to 1). As a result, in the for loop,
we only define the producing quantity of the initial MO.
This is a first issue: step 6, suppose the user rather opens the
detailed operations of the line: it displays the new MO, the
producing qty is 0 but the consumed quantity of the component is 9.
This is not perfect, but let's ignore this and continue with the
above steps. The user sets the done quantity to 2 and validates with
backorder. It runs the productions split again, we use the done
quantity as producing one on the MO, but we don't edit the consumed
quantities, hence the error.
For all these reasons, the safer solution is probably to prevent the
feature 'qty done always editable' in case of subcontracting.
[1] cacc677a08066bc23e1c89df36027599d05f2a08
OPW-3441197
closesodoo/odoo#135862
X-original-commit: 049f63fbc1ab09cf75824e5c22508ea091e5c4dd
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Adrien Widart (awt) <awt@odoo.com>
This commit changes the process flow of stock pickings. A new picking will
always be created in immediate transfer mode and 'ready' state. From
their, it can be validated directly or 'reset to draft'. This second action
switch the immediate mode to planned mode and reset the state as draft.
From their the classical workflow is processed
confirm -> (assigned ->) validated
Task: 3256447
Part-of: odoo/odoo#117513
The 'Structure & Cost' report has been changed to 'Overview', changing
some of its functionnalities. The override previously done in
mrp_subcontracting must be adapted to match the changes done in the mrp
module.
Also, the report has been converted to OWL in the process, requiring
changes in the overriden files as well.
Finally, the now obsolete code only related to the old 'Structure &
Cost' report has been removed.
Task-2628323
Part-of: odoo/odoo#93194
Ease subcontractor stock tracking by using dedicated locations.
Simply declare location as a subcontracting one (rules are
automatically adapted) and set it on vendor.
closesodoo/odoo#88644
Task: 2720393
Related: odoo/upgrade#3755
Signed-off-by: Tiffany Chang <tic@odoo.com>
Previous fix: https://github.com/odoo/odoo/pull/84631 missed the case
when raw_move_ids have already done move_orig_ids (i.e. when 2/3 step
MOs or subcontracting w/ resupply contractor). This made it so when
MOs are backordered, these moves would not be reserved even though they
were in the original MO.
This issue was fixed during a refactoring (reserved amounts are now
distributed to backordered MOs), but this commit will add a test to
prevent the issue from returning in the future.
Part of Task: 2777571
Original PR fix (pre-refactoring): odoo/odoo#91460closesodoo/odoo#97383
X-original-commit: a825d9ed715b369128c876174ca6ebfac72adbe5
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Tiffany Chang <tic@odoo.com>
In the web client, in a real use case, it's not possible
to write on fields which are invisible,
as it's not possible to write on fields which are readonly.
This is a first step in the goal to change the behavior
of the `groups=` attribute in the back-end views,
to remove them for the view instead of making them invisible.
This is mainly to reduce the diff of the revision that will introduce
the mentioned above behavior change.
As nodes with `groups=` will be removed from the view
when the user doesn't have the group, it's no longer possible
to set a value on a field having a `groups=` the user doesn't have
in the `Form` test class, as the field will no longer be at all in the
view.
However, these unit tests shouldn't have been able to set values
on invisible fields in the first place.
This revision therefore aims to correct the unit tests setting value
on fields which were invisible because the user executing the
test was not part of the required group(s) for these fields
to be visible in the view.
closesodoo/odoo#94337
Related: odoo/enterprise#28936
Signed-off-by: Denis Ledoux (dle) <dle@odoo.com>
In module mail, invalidating 'message_ids' on a mail thread also
invalidates its inverse field 'res_id' on messages. If you haven't
flushed it before, your cache will be inconsistent, as shown by the test
/mail:TestMailgateway.test_message_process_bounce_records_channel.
In module purchase_stock, add depends on report.stock.quantity. This
ensures that when the model is queried after changes in other models,
the data on which the SQL view depends is flushed to the database before
querying that model's table.
closesodoo/odoo#66938
Related: odoo/enterprise#16722
Signed-off-by: Raphael Collet <rco@odoo.com>
Co-authored-by: Vincent Schippefilt <vsc@odoo.com>
BoM Structure & Cost report has different errors:
- The product cost of a subcontractor included in a product doesn't
scale with the quantity of the product (Issue 1)
- The BoM cost of a product composed of a subcontractor doesn't include
the subcontractor price (Issue 2)
- The BoM cost of a component composed of a subcontractor doesn't scale
with the quantity for the subcontractor price (Issue 3)
Steps to reproduce:
1. Install mrp_subcontracting_purchase
2. Create a product 'TEST 1', in the Purchase tab specify 'Azure
Interior' as vendor with price 5$
3. Create a bill of material for the product 'TEST 1' with BoM type
'subcontracting', subcontractor 'Azure Interior' and product 'Bolt' as
component
4. Create another product 'TEST 2', in the Purchase tab specify 'Azure
Interior' as vendor with price 8$
5. Create a bill of material for the product 'TEST 2' with BoM type
'subcontracting', subcontractor 'Azure Interior' and product 'TEST 1'
as component
6. Go to the BoM Structure and Cost of product 'TEST 1'
7. The product BoM Cost doesn't include the subcontractor price (it
should be the sum of its components) (Issue 1)
8. Increase the quantity of the product by 1
9. The subcontractor's product cost doesn't change (it should increase
with the quantity) (Issue 2)
10. Go to the BoM Structure and Cost of product 'TEST 2'
11. Increase the quantity of the product by 1
12. The BoM Cost of component 'TEST 1' only counts the subcontractor
price once (it should be the sum of its components) (Issue 3)
Solution:
Scale the subcontractor product cost with the quantity, update the
BoM cost of a product with the subcontractor price (in `_get_bom`) and
scale the subcontractor price with the quantity (in `_get_price`)
opw-2844482
closesodoo/odoo#92095
X-original-commit: 4f3347c6925e10ec62a85bb01d7cdb65b1e13b15
Signed-off-by: Adrien Widart <awt@odoo.com>
Signed-off-by: Guillaume Merlin (megu) <megu@odoo.com>
Adapt db775ffd308638a390be52eba3ca11c9c2d1602d to subcontracting flow,
to avoid performance issues when receiving a large amount of SNs
closesodoo/odoo#85603
Task: 2777451
Signed-off-by: Arnold Moyaux <arm@odoo.com>
This task will:
- Clean the code (e.g. the production's moves are now created directly)
- Have the same behavior when creating object in the UI or directly in
backend
It's mainly on the `mrp.production` object and most of the computed
stored field are used as default value or act like an onchange on draft
production. Once the production order is validated, it's only modify
by direct write
Task-2709753
closesodoo/odoo#83576
Related: odoo/enterprise#24405
Signed-off-by: Arnold Moyaux <arm@odoo.com>
In case of a MRP subcontracting, it is not possible to process the
delivery with several backorders.
To reproduce the issue:
1. Create two products P_compo, P_finished
- Both storable
- P_compo must have the route "Resupply Subcontractor on Order"
2. Update P_compo's quantity: 5
3. Create a BoM:
- Product: P_finished
- BoM type: Subcontracting
- Subcontractors: a partner P
- Components: 1 x P_compo
4. In Inventory, create a planned transfer T:
- Operation Type: Receipt
- Receive From: P
- Operations: 5 x P_finished
5. Mark as Todo
6. Inventory > Resupply Subcontractor, find the delivery of P_compo for
P and process it
7. Back to T, set the done quantity to 1.25
8. Validate T (with backorder)
9. On the backorder BO1, set the done quantity to 1.0
10. Validate BO1 (with backorder)
11. Open the second backorder BO2 and validate it
Error: a Validation Error is displayed "You can not enter negative
quantities.", which doesn't make sense
The issue comes from the inner method `_get_available_move_lines` in
`_action_assign`. When validating a picking, at some point, we are here,
at the beginning of `/mrp_subcontracting._action_done`:
https://github.com/odoo/odoo/blob/6d6b2c41adfa842c82252373b3dbd1ed0a5ebc92/addons/mrp_subcontracting/models/stock_picking.py#L36-L37
To understand what happens next, we need to note that, in this method,
the associated MO will be marked as done later (on line 76). Back to the
current line (L37), we are calling `super` which leads to the
problematic `_get_available_move_lines`. Suppose we are on step 10 (we
are validating the first backorder), we have
https://github.com/odoo/odoo/blob/58a9f57c0827a51e46ef0f52a3d48ba343667fe0/addons/stock/models/stock_move.py#L1390-L1391
`move_orig_ids` contains two stock moves, each one associated to one MO.
However, as said above, the second MO is not yet marked as done, this
will be done later on in `/mrp_subcontracting._action_done`. Therefore,
`move_lines_in` is only defined with the first SM, from the first MO,
with a quantity of `1.25`
Further in `_get_available_move_lines`, we have:
https://github.com/odoo/odoo/blob/58a9f57c0827a51e46ef0f52a3d48ba343667fe0/addons/stock/models/stock_move.py#L1403-L1405
`move.move_orig_ids.mapped('move_dest_ids') - move` gives two SM, and
here is the issue: the second one is already processed, so both are kept
in `move_lines_out_done` and the sum of their quantity is equal to
`1.25 + 1 = 2.25`
Therefore, at the end of the method, when computing the difference, it
gives a negative difference. This negative value will be used to create
a SML and later on, it will trigger the validation error.
Once the above issue is fixed, there is another "invisible" issue that
need to be fixed: when generating several backorders on the deliveries,
only the first one will trigger the creation of a new MO. Suppose we are
back in `/mrp_subcontracting._action_done` (still on step 10 in the
above case), in the first for-loop:
https://github.com/odoo/odoo/blob/6d6b2c41adfa842c82252373b3dbd1ed0a5ebc92/addons/mrp_subcontracting/models/stock_picking.py#L39-L43
`move._get_subcontract_production()` returns the two MO (from the
initial picking and from the first backorder). However, since the first
one has already been processed, the if-condition is validated.
Therefore, this for-loop is done and the second MO is not processed (the
quantities are not recorded and its field
`subcontracting_has_been_recorded` is not defined to `True`). As a
result, still in `/mrp_subcontracting._action_done`, we are now in the
second for-loop:
https://github.com/odoo/odoo/blob/6d6b2c41adfa842c82252373b3dbd1ed0a5ebc92/addons/mrp_subcontracting/models/stock_picking.py#L71-L72
`_subcontracting_filter_to_done` removes the two MOs because the first
one is done and the second one has not its field
`subcontracting_has_been_recorded` set to `True`. The condition in the
first for-loop is not accurate enough.
OPW-2731658
closesodoo/odoo#83658
X-original-commit: 1b740ae148acfc832b124122763817b08ea110ab
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
There is 2 major issues with the production of multiple serials number
- Performance issue
- Duplicated code with classic backorder mechanism
The performance issues exist since backorders were create one by one
and `stock.move` and `stock.move.line` are always recomputed. They
are not created in batch neither.
_generate_backorders is removed and replace by _split_productions. The
functionality are the same. Technicaly it does the maximum in batch,
first it creates all the `mrp.production` then all the `stock.move`
and finaly, it splits the existing `stock.move.line` among the new
`stock.move`
It means that the reservation is not recompute anymore during a
backorder process and will remain the same than the splitted production
order.
Performance metrics (10 components):
| 2 | 10 100 1000
before | 0.47s | 2.84s | 32.25s | 580.53s
-----------------------------------------------
after | 0.13s | 0.36s | 2.60s | 35.17s
task 2633369
Part-of: odoo/odoo#77254
The stock convention on location name is always to name the destination
`location_dest_id`. It was not the
case on the stock rule model
Task: 2648449
Part-of: odoo/odoo#80434
When validating a receipt, if the product is subcontracted and if the
picking is not fully done, it will be impossible to create a backorder
To reproduce the issue:
1. Create two products P_compo, P_finished
- Both storable
- Both tracked by lot
- P_compo must have the route "Resupply Subcontractor on Order"
2. Update P_compo's quantity: 4
3. Create a BoM:
- Product: P_finished
- BoM type: Subcontracting
- Subcontractors: a partner P
- Components: 1 x P_compo
4. In Inventory, create a planned transfer T:
- Operation Type: Receipt
- Receive From: P
- Operations: 4 x P_finished
5. Mark as Todo
6. Inventory > Delivery Orders, find the delivery of P_compo for P and
process it
7. Back to T, Record Components:
- Quantity: 3/4
- Set a Lot for P_finished
8. Validate T, Create Backorder
Error: a User Error is raised "You need to supply a Lot/Serial Number
for product: - P_finished"
Since P_finished is subcontracted, a related MO has been generated. On
step 7, when recording the used components, since all P_finished have
not been produced, a second MO is created for the last P_finished.
However, when validating T, both MOs are selected and validated. This is
an error since the user has not yet recorded the used components for the
last MO. The latter should not be validated.
OPW-2582538
closesodoo/odoo#78496
X-original-commit: 21068076b4a6b134f5f07c4c03de7c4eb37b4688
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
In a lot of test class, we use `setUp` instead of
`setUpClass`. `setUp` is execute for each test method and `setUpClass`
will be execute only once by Class (and use savepoint + rollback).
Then change setUp into setUpClass reduce the time to make all tests
and avoid to repeat this error for the future.
closesodoo/odoo#78082
Related: odoo/enterprise#21563
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
Take in account the bom consumption of subcontracting BoM:
- In flexible and warning we can now record extra component
(even if there isn't tracked component).
- In the warning case, we get a warning issue in during the recording
of component if we consume more than expected
- In case of script consumption, we cannot record component expected
if some are tracked. In this case we can consume more than expected
only if the user is a mrp manager.
Also fix "Set quantities" Button for the subcontracting
task-2486811
closesodoo/odoo#75041
Related: odoo/enterprise#20350
Related: odoo/upgrade#2750
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
- The "BoM Structure & Cost" takes now in account
the subcontracting cost.
The subcontracting cost depends of the best supplier info in product
and subcontractor register in the BoM.
- Also add this subcontracting cost (to the cost field) when we click on
"Compute Price from BoM" in the product view.
task-2486811
Part-of: odoo/odoo#75041
Add a operation type (`stock.picking.type`) for
the subcontracting resupply in order to distinct
easily the a simple delivery and a resupply to a subcontractor.
task-2486811
Part-of: odoo/odoo#75041
In subcontracting, there wasn't a way to make
the subcontracting resupply delivery plan before
the subcontracting receipt.
Now the hidden subcontracted MO, take in account
(in his planning) the `produce_delay` (in days) of
the product which is automatically plan the
subcontracting resupply delivery correctly.
task-2486811
closesodoo/odoo#75072
X-original-commit: 829369d3ca0530f1aad0599fbb1598810a928cc3
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: Rémy Voet <ryv-odoo@users.noreply.github.com>
Before this commit, for a subcontracted product with reserved available
tracked components, if at least one component is recorded but not all,
the "Record components" button isn't available anymore.
How to reproduce:
- Create a product and create a subcontracting BOM for this product;
- Add a tracked component for this product;
- Add some qty. for the tracked component in the subcontracting loc.;
- Create a receipt for the subcontracted product (for demand qty. more
than 1) with the subcontractor as partner and confirm it:
=> The "Record components" button should be visible.
- Record a part of the demand qty. then click on "Continue", then on
"Discard":
=> The "Record components" button is now hidden.
It's because the button is hidden if all the MO are done or to close
(they are) and if all the tracked move lines have a SN/LN (they have as
they are reserved).
task-2604728
closesodoo/odoo#73991
X-original-commit: 392bc27c0ef0bc238a7eac98497b293622f0fe1d
Related: odoo/enterprise#19756
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Step to reproduce:
- Create a subcontracting BoM by partner A,
for a tracked product B (by serial or lots)
- Create a incoming transfer coming from A and mark as todo.
- Fill the move with move lines with lot + quantity.
- It is impossible to validate the transfer, "You need to supply lot..."
Also at the creation of the picking a warning popover indicate that
the previous operation (the hidden MO) is set after the transfer.
These issues comes from the refactor of mrp for v14 and the part of
subcontracting wasn't complete obviously.
Fixes done:
- Rewrite the code of the `_action_done` for subcontracting. It is for
the case of tracked finished product without any tracked component,
there wasn't any code to manage that. Now manage it by backorder MO
feature. Fix the main bug
- Set finished_date_planned before the transfer to avoid the alert
popover.
- Avoid to write activity in channel about the hidden MO in case of
cancelling.
- Fix `action_record_components` to manage multiple subcontracting
products with tracked component.
- Remove the `priority` field from the wizard MO (in case of tracked
product. Also the wizard is not really a wizard, just a weird hybrid
MO form)
PR: odoo/odoo#61606
task-2357115
closesodoo/odoo#62109
X-original-commit: 1a34e46eaca14aec981dd0f162e8014c7cb0abea
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: Rémy Voet <ryv-odoo@users.noreply.github.com>
This commit does 3 things:
1. When 'action_confirm' is triggered in a manufacturing order, any
'move_raw_ids' (components) that are unable to be fully reserved
when `action_assign` is triggered will be checked for an automatic
reordering rule (RR). If a rule exists it will be auto-triggered.
This includes subcontractor manufacturing orders. Relevant test
updated to match this.
2. When a MO is completed, auto check if there are corresponding
confirmed stock moves that can be populated by the completed products
and trigger their 'action_assign' to reserve the completed products.
3. If a new move line is added to an already confirmed MO, then do same
auto-RR check/trigger. (note will occur for pickings without extra
code since `stock_picking.action_confirm` is triggered again in this
case.)
This reuses similar logic as odoo/odoo#52433 from task 2244230.
Originally this was done in the `action_assign`, but has been moved to
`action_confirm` so as to imitate the now archived MTO process with RR.
Overlapping logic has been moved into stock_move for easier reusability.
Note that this now means editing existing moves' `product_uom_qty` (i.e.
Demand) will not have a flow to auto-trigger their RR.
Subcontracting test updated to match + new mrp test added for this new
feature.
closesodoo/odoo#57334
Task: 2322496
X-original-commit: 2688cd1bae489b1dec8862f4de727ac20514844c
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Improve onboarding by removing the replenish on order route.
Companies that do MTO process could unarchive the route in
order to have a basic configuration.
closesodoo/odoo#55147
Task: 2245882
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
After the odoo/odoo#52949 , the registering of tracked component,
in case of subcontracting, was broken. Fix and try to mimic
the same flow than before. The produce wizard has been replaced
by a clean MO form to register component and use backorder mechanisme
of MO to manage tracked finished product + tracked component.
task-2278147
closesodoo/odoo#54994
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
New report to easily order missing products in each warehouse.
Orderpoint have a new type: 'manual'. Manual orderpoint are not
trigger by the scheduler but the user could create replenishment
from the report directly. The report use the forecast report in
order to detect missing quantity for today (it does not search
depending the lead time for each product warehouse due to lake
of performance). It compares missing quantity with incoming RFQ
and other ongoing orderpoint. If it still missing a new entry
for replenihsment is created (it's also automaticaly deleted if
the replenihsment has been done another way).
Task: 2161378
**Steps to reproduce:**
* Create a subcontractor.
* Create a BoM of type Subcontracting and assign the subcontractor.
* Create a children contact for the subcontractor.
* Creat a purchase order (or a receipt picking) with the children contact of the subcontractor.
* Confirm the document.
**Current behavior:**
Subcontractor documents are not created.
**Expected result:**
They should be created.
**Cause:**
The BoM search is not including possible parents of the partners.
**Solution:**
With the use of `parent_of` operator in the search, we cover both cases of the children
and the parent as initiators of the subcontracting.
closesodoo/odoo#46670
X-original-commit: 86726aba26f4ba8d7dadb29ed2415baf49fe54c0
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
When subcontracting a product via a purchase order and not a simple
receipt. Then the cancelation of the receipt will not only cancel
the receipt of the finished product but not the delivery for the
components.
It happens because button_cancel on purchase order will call
_action_cancel the stock.move linked to purchase order line. It will
not call action_cancel on the stock.picking. However the part
responsible for the cancelation of components delivery is in the
stock.picking action_cancel method.
Move the stock.picking action_cancel logic in the stock.move
_action_cancel method since it's always call for both usecase.
Fixes#42551closesodoo/odoo#42653
X-original-commit: 841305f271411c3a67af271ac09da9ce0922f100
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
followup of rev [0]
If these wizards are called on multiple pickings, display the list of
the pickings that could be impacted and allow to select which one should
be impacted.
We also adapt the sanity checks at the start of `button_validte` in
order to specify the concerned pickings if needed. We do not enable the
multi behavior for batch at the moment, so it's only enabled for the
validate multi in the list view.
[0] 6ab4b0d496
task-2069646
closesodoo/odoo#41497
X-original-commit: ff276c6484b138982f185ec9c832f2dbf25baaef
Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>