BoM Structure & Cost report has different errors:
- The product cost of a subcontractor included in a product doesn't
scale with the quantity of the product (Issue 1)
- The BoM cost of a product composed of a subcontractor doesn't include
the subcontractor price (Issue 2)
- The BoM cost of a component composed of a subcontractor doesn't scale
with the quantity for the subcontractor price (Issue 3)
Steps to reproduce:
1. Install mrp_subcontracting_purchase
2. Create a product 'TEST 1', in the Purchase tab specify 'Azure
Interior' as vendor with price 5$
3. Create a bill of material for the product 'TEST 1' with BoM type
'subcontracting', subcontractor 'Azure Interior' and product 'Bolt' as
component
4. Create another product 'TEST 2', in the Purchase tab specify 'Azure
Interior' as vendor with price 8$
5. Create a bill of material for the product 'TEST 2' with BoM type
'subcontracting', subcontractor 'Azure Interior' and product 'TEST 1'
as component
6. Go to the BoM Structure and Cost of product 'TEST 1'
7. The product BoM Cost doesn't include the subcontractor price (it
should be the sum of its components) (Issue 1)
8. Increase the quantity of the product by 1
9. The subcontractor's product cost doesn't change (it should increase
with the quantity) (Issue 2)
10. Go to the BoM Structure and Cost of product 'TEST 2'
11. Increase the quantity of the product by 1
12. The BoM Cost of component 'TEST 1' only counts the subcontractor
price once (it should be the sum of its components) (Issue 3)
Solution:
Scale the subcontractor product cost with the quantity, update the
BoM cost of a product with the subcontractor price (in `_get_bom`) and
scale the subcontractor price with the quantity (in `_get_price`)
opw-2844482
closesodoo/odoo#92095
X-original-commit: 4f3347c6925e10ec62a85bb01d7cdb65b1e13b15
Signed-off-by: Adrien Widart <awt@odoo.com>
Signed-off-by: Guillaume Merlin (megu) <megu@odoo.com>
In the bom cost report template, a "tr" is missing and no parent_id for
the subcontructing part. This result in a leftover line each time you
fold the bom. Add them to the tamplate.
Task-2657280
X-original-commit: 6ae623dc2d5131e2b11969f1bc1f8dd6096a9005
Part-of: odoo/odoo#77945
- The "BoM Structure & Cost" takes now in account
the subcontracting cost.
The subcontracting cost depends of the best supplier info in product
and subcontractor register in the BoM.
- Also add this subcontracting cost (to the cost field) when we click on
"Compute Price from BoM" in the product view.
task-2486811
Part-of: odoo/odoo#75041