Commit Graph
14 Commits
Author SHA1 Message Date
Christophe Simonis b81c2bce84 [MERGE] forward port branch saas-11.4 up to 3c108977c1 2018-10-22 16:59:51 +02:00
Christophe Simonis 1ade6675c3 [MERGE] forward port branch 11.0 up to 717f458394 2018-10-11 16:29:46 +02:00
Goffin Simon d211ea5f7c [FIX] purchase_mrp: Received Quantity in Purchase Order remains '0'
Steps to reproduce the bug:

- Create Product P: with BOM type - Kit and BOM components > Set - Invoicing: on delivered quantity
- Create PO with P and confirm - shipment 1 will be generated
- Cancel the PO - shipment 1 - will also get canceled
- Reset the canceled PO to quotation and confirm it - new shipment 2 will be generated
- Validate the shipment and receive product KIT

Bug:

Check PO - 'Received Qty' was not updated

Inspired from: https://github.com/odoo/odoo/commit/c2dfdc3081764a492a94024f1fb57e15636b04c9

opw:1889303

closes odoo/odoo#27622
2018-10-10 11:34:37 +00:00
Arnold Moyaux 107b275a18 [IMP] mrp: log activity
Pickings/MO/SO/PO can be linked. Only the increased quantity is
propagated between documents. However their ordered quantities can
also be decrease or they can be cancel. In this case an activity
is created on impacted documents in order to describe the situation
and inform the user that a manual action is probably require.

Also in order to propagate the increased quantity from a MO, we have
to do important modification in MRP and we want to avoid doing it before a
major release. That's why increased quantity on a MO also work with
activity at the moment.
2018-08-13 15:38:34 +02:00
Goffin Simon 487873f170 [FIX] purchase: Error when updating dropship order
Steps to reproduce the issue:

- change the demo user settings -> use Sales: User: All Documents only
- create a stockable product with dropship feature on and a supplier
- connect as the demo user
- create a sales order with this product
- confirm the order
- as the admin user, confirm the purchase order generated through dropship
- connect as the demo user
- open the confirmed SO
- add a line with this product
- save the SO

Bug:

An access rights error was raised.

opw:1866015
2018-07-19 11:12:09 +02:00
Christophe Simonis c703a2a0c3 [MERGE] forward port branch 11.0 up to d279a3e6d5 2017-11-16 17:55:37 +01:00
Simon Lejeune 99b9874ab3 [FIX] mrp, purchase_mrp: purchase_line_id also with kits
When confirming a move for a kit, it is basically unlinked and replaced
by moves for its component. The link to the purchase line was kept in
v10, but since rev[1] it is not anymore. Make an helper to get the
values and override it in purchase_mrp to add the purchase line link.

[1] https://github.com/odoo/odoo/commit/8248f0e153ae5fcc1449d0d05149b61df615ad4f

opw 779497
2017-11-14 17:44:15 +01:00
Pierre Masereel 2d3e6d7383 [IMP] purchase: edit received quantity on purchase_line when type service
When we purchase products of type services,the received quantity is
always set to the ordered quantity.

We want to be able to manually enter a received quantity on service
products to have a better trace of what have been received or not.

We show the picking stat button olnly if there are picking

We show the columns qty_received, qty_invoiced and invoice_status
depending on the parent state, and not depending on the context passed
in the menu item.
2017-11-08 15:28:07 +01:00
xmo-odoo b4429c2a91 [FIX] Various P3-related import changes
* LDAP import: python-ldap is not python3-compatible, pyldap is

  Warning: only supported from debian Stretch (current testing)?
  https://packages.debian.org/search?searchon=names&keywords=pyldap

* implicitly relative imports
* imports of moved or removed stdlib modules

issue #8530
2017-04-28 09:06:53 +02:00
Nicolas Martinelli 0a5a423bff [FIX] sale_mrp, purchase_mrp: delivered quantity
- Create a manufactured Product A (sold as kit), invoicing based on
  delivered quantity.
- Create the associated BOM, e.g. contains 2 Products B.
- Create a SO with Product A, validate
- Change the BOM so it contains 2 Products C
- Validate the picking linked to the SO

The delivered quantity is not updated since the delivered products (B)
are not the same than the products of the BOM.

This should not be the case. Changing a BOM should not affect the
invoicing. To solve this, we simplify the check and only verifies that
all moves are done.

The same change is applied for PO.
2017-02-02 15:47:21 +01:00
Christophe Simonis a7ba6cde9c [MERGE] forward port branch saas-12 up to 7134aff 2016-09-28 16:28:31 +02:00
Josse Colpaert 153a6d0814 [FIX] mrp: correct interpretation of explode's quantity parameter
In previous versions, the quantity passed to the bom_explode was the number
of times you needed to count the BoM.  If the BoM was for 2 dozens and you pass
48 units, 2 was passed to the bom_explode method.  We are now doing the same
for the explode method and we check it is called this way everywhere.
2016-09-28 12:38:13 +02:00
Thibault Delavallée 0f0ca1c133 [REF] product_uom, *: clean quantity computation methods
product_uom._compute_quantity is an ensure one multi method taking a browse
record as second paramter. It replaces _compute_qty and _compute_qty_obj
to have a single and standard computation method.
2016-08-01 15:05:32 +02:00
Josse Colpaert 2ddc35a530 [REF][NEWPIE] mrp: new MRP
This commit contains the core of the new MRP. It contains a whole refactoring
of the MRP application, with improved and new features, written in new API.
Among other here are the main manufacturing workflow improvements :

 - Picking type not only for pickings but also for manufacturing orders
 - Properties replaced by picking type
 - BoM can only be produced with its routing (no other)
 - Either produce without routing with only production orders, or produce with
   routing
 - By default, there is an order in the work orders (serially), but you can
   override it to be able to work in parallel
 - Time clocking on work orders and block time on work centers with reporting
   on OEE, performance, losses, ...
 - Real-time adaptation of timings on operations
 - Lots/serial numbers can be inputted like in the pickings on manufacturing
   orders.  It is also possible to input them in the work orders.
 - Material availability independent of production order state (possibility to
   start production when only part of it is there)
 - Work sheets on work orders
 - Put messages on work orders to make your workers pay attention to something
 - Full traceability link to see for each produced piece of stock, the
   consumed pieces, ...
 - Separate scrap object (a scrap is not done based on an original move
   anymore)
 - Separate unbuild system (if you want to unbuild into its original
   components)

Thanks to all people that helped during this development, notably but not
limited to Chirag A Dodiya (cod@odoo.com), Gaurav Panchal (gan@odoo.com),
Jignesh Rathod (jir@odoo.com), Mansi Trivedi (mtr@odoo.com), Pariket Trivedi
(ptr@odoo.com).
2016-07-04 16:22:37 +02:00