There is 2 major issues with the production of multiple serials number
- Performance issue
- Duplicated code with classic backorder mechanism
The performance issues exist since backorders were create one by one
and `stock.move` and `stock.move.line` are always recomputed. They
are not created in batch neither.
_generate_backorders is removed and replace by _split_productions. The
functionality are the same. Technicaly it does the maximum in batch,
first it creates all the `mrp.production` then all the `stock.move`
and finaly, it splits the existing `stock.move.line` among the new
`stock.move`
It means that the reservation is not recompute anymore during a
backorder process and will remain the same than the splitted production
order.
Performance metrics (10 components):
| 2 | 10 100 1000
before | 0.47s | 2.84s | 32.25s | 580.53s
-----------------------------------------------
after | 0.13s | 0.36s | 2.60s | 35.17s
task 2633369
Part-of: odoo/odoo#77254
Allow to produce several serial numbers at once.
Only when BoM do not contain any component tracked by unique serial number
and lot ones are from 1 lot.
Also allow to copy/paste serial numbers.
This applies to manufacturing orders.
Task: 2444742
Part-of: odoo/odoo#71732
Removed abstract workorder
Removed the integration of expiry wizard in tablet view since it should
be moved in enterprise in the tablet view implementation (not possible
to set consumed lot on workorders on community anymore)
Refactor _set_quantity_done to use ORM command in order to not return a
dict with vals to_create/to_write
task-2241471
Allow to "backorder" a production, meaning create another manufacturing
order with the quantity remaining to produce. We also use the
reservation of the first order on the next ones by using
`post_inventory` on the first one and moving the newly created stock
moves to the backorder.
We introduce a wizard similar to the one in stock.
Backorders have a sub-sequence.
Backorders are linked together through the procurement group.
We allow creating a backorder even if workorders are running by closing
them, the backorder will call `button_plan` and create its own.
task-2241471
Ensure proper domains are applied and enforced on relation fields thanks
to the `check_company` attributes.
Make sure unbuild have proper sequence for each companies.
The produce wizard and workorders company is the one of the production.
The BoM line company_id is the one of its bom_id.
Added some tests.
task-1985992
Manufacturing Order can now be cancelled even if some move lines or Work
Orders are done (in this case, a wizard ask confirmation to the user).
Task #1969034
Co-authored-by: Arnold Moyaux <arm@odoo.com>
PURPOSE
=======
Make the traceability report available in more use cases.
SPECIFICATIONS
==============
1. Traceability Button on Manufacturing Orders
There should always be a traceability report available on the MO,
no matter if the finished product is tracked or not.
Example 1 : finished product is not tracked
but the components are tracked
Example 2 : finished product is not tracked (qty>0)) but
the components are tracked
Example 3 : no products are tracked
Task id: 1861928
Currently MRP do not handle multi locations for components. In order to
be able to use both feature at the same time, we could:
- Improve mrp in order to handle multiple stock.move.line for a
componenet stock.move
- Add a rule that allow to bring all the good from multiple location to
a single location. (was already possible but it requires some
configuration)
This commit introduce a checkbox on the warehouse in order to
automatically configure all the routes/rules/locations/picking_types,...
necessary to bring all the components to a single location before
running the manufacturing order.
Technically it also refactor some stock_warehouse.py methods in order to
easily override the picking_type, rules and routes creation.
Thank to Hetashree Chauhan <hch@odoo.com> for his help.
task_id: 27785
Since refactoring in saas-17 quant_ids are removed and
the logic is instead locate on stock_move_line. This commit
adapt the method by trying to undo the created move_line
during the MO.
This commit also add a default_uom_id in the view's context in order
to remove a traceback. Since 0469d2e
uom is mandatory on stock_move_line.
It also add a bunch of tests in order to check the behavior of unbuild
with 4 test: without tracking, consumed product tracking, produced product
tracking and everything tracking.
Know limitation of this commit:
-> No warning message when unbuild more than in stock.
-> Wrong result if trying to unbuild twice the same MO
with consumed product tracked with different lot/SN
This commit contains the core of the new MRP. It contains a whole refactoring
of the MRP application, with improved and new features, written in new API.
Among other here are the main manufacturing workflow improvements :
- Picking type not only for pickings but also for manufacturing orders
- Properties replaced by picking type
- BoM can only be produced with its routing (no other)
- Either produce without routing with only production orders, or produce with
routing
- By default, there is an order in the work orders (serially), but you can
override it to be able to work in parallel
- Time clocking on work orders and block time on work centers with reporting
on OEE, performance, losses, ...
- Real-time adaptation of timings on operations
- Lots/serial numbers can be inputted like in the pickings on manufacturing
orders. It is also possible to input them in the work orders.
- Material availability independent of production order state (possibility to
start production when only part of it is there)
- Work sheets on work orders
- Put messages on work orders to make your workers pay attention to something
- Full traceability link to see for each produced piece of stock, the
consumed pieces, ...
- Separate scrap object (a scrap is not done based on an original move
anymore)
- Separate unbuild system (if you want to unbuild into its original
components)
Thanks to all people that helped during this development, notably but not
limited to Chirag A Dodiya (cod@odoo.com), Gaurav Panchal (gan@odoo.com),
Jignesh Rathod (jir@odoo.com), Mansi Trivedi (mtr@odoo.com), Pariket Trivedi
(ptr@odoo.com).
A squashed merge is required as the conversion of the apiculture branch from
bzr to git was not correctly done. The git history contains irrelevant blobs
and commits. This branch brings a lot of changes and fixes, too many to list
exhaustively.
- New orm api, objects are now used instead of ids
- Environements to encapsulates cr uid context while maintaining backward compatibility
- Field compute attribute is a new object oriented way to define function fields
- Shared browse record cache
- New onchange protocol
- Optional copy flag on fields
- Documentation update
- Dead code cleanup
- Lots of fixes