Nicolas Martinelli 0dd08bd148 [FIX] mrp: change BOM
- Create a MO for Product A with quantity to produce of 2
- Produce 1
- Open the associated BOM, and add a line to the bom
- Go back to the MO and try to update the qty to produce to 1

Traceback: division by 0

opw-1838006
2018-04-20 10:11:11 +02:00
len-odoo ec02710b86 [FIX]mrp: Byproducts are produced twice
When producing a byproduct in a BoM, the quantity for the byproduct was
increased by twice its produced quantity.

This is essentially a revert of commit d7fdb636b8
which was erroneously forward-ported to 11.0,
where byproducts were already correctly counted.

opw:1834226
2018-04-17 11:40:19 +02:00
Arnold Moyaux b33d5af4a7 [FIX] stock: allow to validate a picking with 2 extra moves
Use case to reproduce:
- Create a picking containing 2 moves that have a quantity_done greater than reserved quantity
- Validate the picking with or without backorder

Traceback due to a record that do not exist anymore.

It happens due to 2 functionality that have a wrong behavior when used together:
- merge_move function that will try to merge moves with same characteristics inside a same picking.
- action_done functionality that will create an extra move if the quantity done for a move is greater
than reserved quantity. (the extra move is used in order to propagate changes)

With our usecase:
- MOVE A, reserved_qty: 10, qty_done: 20
- MOVE B, reserved_qty: 10, qty_done: 15
action_done on move A will create a new move thus we will have
- MOVE A, reserved_qty: 10, qty_done: 20
-  A bis, reserved_qty: 10, qty_done: 0
- MOVE B, reserved_qty: 10, qty_done: 15
then merge move will not only merge move A and A bis but will also merge B
which result with inconsenstencies and traceback since system will try to
process move B after A
- MOVE A,A',B reserved_qty:30, qty_done:35 (the 5 extra qty is not propagated)

This commit adds a kwarg in action_confirm that is propagated to merge_move
this kwargs is a record set taht will limit the moves that can be used for the merge
in order to merge extra move in original move

opw-1825264
2018-03-27 17:36:44 +02:00
Christophe Simonis f22c5794c4 [MERGE] forward port branch saas-15 up to a9542240fc 2018-03-27 17:17:38 +02:00
Christophe Simonis a9542240fc [MERGE] forward port branch saas-14 up to ce5b4b6512 2018-03-27 16:41:47 +02:00
Christophe Simonis ce5b4b6512 [MERGE] forward port branch 10.0 up to fc659d3f78 2018-03-27 16:10:35 +02:00
Nicolas Martinelli e78a08e336 [FIX] mrp: date expected
- Create a MO
- Change the date 'Deadline Start'

The corresponding 'Expected Date' on the stock moves is not updated with
the new value.

opw-1828631
2018-03-27 08:24:33 +02:00
Nicolas Martinelli 65214c01b5 [FIX] mrp: BOM count on product
- Create a Product A with attribute color and attribute values white and
  black.
- Create 3 products (Components 1, 2 and 3)
- Create a BOM for A like:
  Component 1, Variant column is empty
  Component 2, Variant white
  Component 3, Variant black
- Go to Inventory > Master Data > Product Variants, and open one of the
  2 variants of Product A

The BOM count is zero, while it should be 1.

The current implementation of `bom_count` doesn't take into account
attributes that can be set on the BOM line.

opw-1814973
2018-03-15 13:35:54 +01:00
Christophe Simonis dbb713c2f8 [MERGE] forward port branch saas-16 up to 49f8548557 2018-02-21 19:17:01 +01:00
Christophe Simonis 49f8548557 [MERGE] forward port branch saas-15 up to 085ff2f9c4 2018-02-21 18:36:36 +01:00
Christophe Simonis 085ff2f9c4 [MERGE] forward port branch saas-14 up to 8c692aac88 2018-02-21 18:09:17 +01:00
Christophe Simonis eebc7b6e32 [MERGE] forward port branch 10.0 up to 1512618d3e 2018-02-21 12:42:46 +01:00
Josse Colpaert c0f15c57fe [FIX] mrp: Changing the routing on a bom
When changing the routing on a bom, "Consumed in Operation" indicated
in some lines of the BoM did not correspond to the routing used.
So the system did not link it to a workorder and it was never consumed when
a MO was processed.

Now the "Consumed in operation" are reset  when the routing is changed.

opw:807560
2018-02-20 13:02:51 +01:00
Christophe Simonis 72508cc241 [MERGE] forward port branch saas-16 up to 7792755946 2018-02-14 18:26:57 +01:00
Christophe Simonis 7792755946 [MERGE] forward port branch saas-15 up to d24bdbde81 2018-02-14 17:18:59 +01:00
Christophe Simonis d24bdbde81 [MERGE] forward port branch saas-14 up to 9d0de61114 2018-02-14 16:34:13 +01:00
Christophe Simonis 9d0de61114 [MERGE] forward port branch 10.0 up to 73c2ac451a 2018-02-14 16:04:23 +01:00
Goffin Simon d7fdb636b8 [FIX]mrp, mrp_byproduct: Qty is not "produced" for Byproducts
When producing a product as a BoM, the quantity for the byproduct was not increased in "produced".

opw:814768
2018-02-13 14:07:23 +01:00
Christophe Simonis f5e7b86686 [MERGE] forward port branch saas-16 up to 920aa6174c 2018-02-01 17:02:19 +01:00
Christophe Simonis 920aa6174c [MERGE] forward port branch saas-15 up to e0422bfd6c 2018-02-01 16:40:13 +01:00
Christophe Simonis e0422bfd6c [MERGE] forward port branch saas-14 up to 7d465aa56c 2018-02-01 15:39:39 +01:00
Christophe Simonis 7d465aa56c [MERGE] forward port branch 10.0 up to 4c9bf7faae 2018-02-01 14:16:50 +01:00
Nicolas Martinelli 93c4c5cfb1 [FIX] mrp: multi-company bom find
- Create 2 companies A & B
- Create a product P with 2 phantom BOMs:
  Component C1 for company A, with sequence = 10
  Component C2 for company B, with sequence = 0
- Create a SO in company A for P, validate

The picking contains C2, while one would expect C1 since C2 is only for
company B.

opw-807640
2018-01-30 15:20:17 +01:00
Simon Lejeune 6ef460b6a7 [REF] stock, mrp: remove constraint, add onchanges
We added a constraint in [1] to improve the usability of introducing
tracked move lines in the system. However, this contraint proved to be
too costly (trigger multiple time during the validation process, never
called in batch as it is set on the model at the end of a o2m).

We replaces the constraint by checks on the validating process or by
(non-blocking) onchanges.

With these changes, validating the receipt of 3000 tracked move lines
goes from 17 minutes to around 4.

[1] 482407464a

opw-803887
2018-01-18 14:37:13 +01:00
Florent de Labarre 2bd10fa757 [FIX] mrp: unbuild use the MO instead of BOM
When the user unbuild a product with a MO specified
the system will generate the inverse moves from the BOM.
However the BOM could have change.

This commit instead use the MO specified in order to
generate the inverse moves.
2018-01-16 09:30:27 +01:00
Christophe Simonis b42b9c936b [MERGE] forward port branch saas-16 up to 3b7bf3a4b8 2018-01-12 18:15:23 +01:00
Christophe Simonis 3b7bf3a4b8 [MERGE] forward port branch saas-15 up to 8962b8ecc2 2018-01-12 17:23:10 +01:00
Christophe Simonis 8962b8ecc2 [MERGE] forward port branch saas-14 up to d35a76ee17 2018-01-12 16:47:12 +01:00
Christophe Simonis d35a76ee17 [MERGE] forward port branch 10.0 up to d76237e038 2018-01-12 16:16:51 +01:00
Nicolas Martinelli d0dbd570b6 [FIX] mrp: digits in move.production.lots
Add decimal precision to quantitites in stock.production.lots.
Otherwise, if the UoM uses a DP larger than 2, inconsistencies may arise
since the field is automatically rounded to 2 decimals in the interface.

For example, if the DP of the UoM is 4:
- Set Qty Done to 1.234567
- Save => qty recorded in DB is 1.234567
- Edit, change nothing and save => qty recorded in DB is 1.23

This happens since the web client parses the value in the DOM and
detects a value change.

opw-788078
2018-01-12 13:48:38 +01:00
Christophe Simonis 4c410ee6a1 [MERGE] forward port branch saas-15 up to 38b201abce 2018-01-09 16:30:50 +01:00
Christophe Simonis 38b201abce [MERGE] forward port branch saas-14 up to e671cdcc44 2018-01-09 15:54:16 +01:00
Christophe Simonis e671cdcc44 [MERGE] forward port branch 10.0 up to 849d8ffd21 2018-01-09 15:12:51 +01:00
Nicolas Martinelli a650f2359b [FIX] mrp: extra move line in sub-location
- Define a Component A tracked by lot.
- Define a Final Product B tracked by lot.
- Create a BOM, e.g. 5 units of A to produce B.
- Get some quantity of A in a sub-location, e.g. 'WH/Stock/Shelf 1'.
- Create a MO for 1 unit of B.
- When clicking on 'Produce', record 6 units consumed instead of 5.
- Post the inventory

5 units of A is removed from 'WH/Stock/Shelf 1' and 1 unit of A is
removed from 'WH/Stock'. The latter might create a negative quant if no
stock is available in 'WH/Stock'.

When the extra move line is created, it is created using the data of the
stock move (in `_generate_consumed_move_line`). When posting the
inventory, the quants selection is made strictly in the location set (in
`_update_available_quantity`), which might cause the mentioned negative
quant.

The solution is to select a sub-location where the product can be found.
This gives a higher chance to avoid negative quants afterwards. Note
that if we wanted to avoid negative quants, we could make a reservation
process on the move, and potentially create several stock move lines.
This is beyond the scope of the integration of MRP with sub-locations.

opw-803969
2018-01-09 08:59:44 +01:00
Josse Colpaert 18bb3ac71b [FIX] mrp: in move validation, take into account the owner
Before this commit, the special mrp validate_move method did a call to
quants_move with an incomplete signature. IN the use case, that we want
to make "own" produced quantities by a third party (maquila), we can do so in
downstream modules by restrict the partner on the move so that any moved (or
created) quants will belong to this partner (owner).  This is certainly
important for the case where finished products are not your own
property.  Courtesy of blaggacao.

Closes #21072
2018-01-05 10:45:26 +01:00
Martin Trigaux cab7e0d204 [FIX] *: add missing space in multilines messages
Courtesy of @Yenthe666
2018-01-03 11:09:09 +01:00
Simon Lejeune 0126823f98 [FIX] mrp: don't copy locked state
When copying a done MO that is unlocked, the new MO is also unlocked and
the buttons to produce/check availability aren't displayed and it is
confusing to the user.

Fixes #20119
2017-12-28 15:31:55 +01:00
Simon Lejeune 7862ce4d5d [FIX] mrp: mo: state and optional bom line
Optional bom line havea default `product_qty` of 0. As the "check
availability" button is displayed if the MO is not available and
the `_compute_availability` method considers all move of 0 `product_qty`
as unassiged, the "check availability" button was always displayed and
it was confusing.

Do not consider move with a 0 product_qty in the `_compute_availability`
method to fix the display of the button.
2017-12-28 15:30:13 +01:00
Arnold Moyaux 1f860fea38 [FIX] mrp: generate move_line with same lot
Usecase to reproduce:
- Set a product with the same lot in different locations
- Create a MO that will uses theses products and that require more than one location
- Produce it.
-> Traceback Expected singleton: stock.move.line

It happens because product produce only expect one move line
by lot. Howeever it could exist more than one move line if the
product for a specific lot are shared among multiple under location.

This commit try to fill the move line with the correct quantity
one by one and add the extra in a new move line.
2017-12-18 11:46:21 +01:00
Arnold Moyaux 08bf52f5db [FIX] mrp: final lot not passed between workorder
Use case to reproduce:
- Create a MO with a product tracked and a qty to produce greater than 1.
- The Bom should also use a routing with at least 2 operations.
- On the first workorder only produce 1 unit and record the production
- Go to the next workorder -> The final lot is not set.

It happens because the lot for the next workorder is only set if the
total quanity for the mo was produced.

This commit fixes the bug by removing the code for the workorder lot
assignation outside the wrong condition. This commit also update the
test test_00b_workorder_process that allows us to find the above bug.
2017-12-18 11:45:32 +01:00
Arnold Moyaux 587a606635 [FIX] mrp: missing rouding
Due to commit fda755b885
misisng a .rounding after the uom in float_round call.
2017-12-14 11:07:14 +01:00
Arnold Moyaux fda755b885 [FIX] mrp: problem with rounding
Basic operation are used instead of using function
from float utility tools.
2017-12-12 14:56:09 +01:00
Arnold Moyaux 9c4c51f417 [FIX] mrp: handle by_products
When creating by products during a workorder the move lines
for the final moves are not created and the user has to manually
create them on the manufacturing order view.

This commit adds an automatic action in order to create
the correct move lines with the consumed quantity for the
by products not tracked by lot or SN.

This commit also fixes a bug where the consumed move lines where
not linked to the by products move lines
2017-12-04 13:44:40 +01:00
Arnold Moyaux 2afedc99a6 [FIX] mrp: workorder SN required only when moves are consumed
When the user do a work order with a final product
tracked by lot or serial number. A serial number is
asked at the end of the first workorder. The purpose is
to link consumed products with the SN/lot produced.

However it could happens that no component are consumed
during the first and following work order.

This commit allows to by pass the lot/SN registration if
nothing is consumed.
2017-12-04 13:38:22 +01:00
Arnold Moyaux 1a125f765e [FIX] mrp: use reserved SN for quality steps.
Use case to reproduce:
- Create a BOM with a component product tracked by SN
- Create a MO for this product and reserve it.
- Plan WO and process it.
- Register the same lot than the reserved one.
-> Error message: you can't use twice the same serial number

It happens because WO use temporary move line that should not
be considered as a real object. However it exists is a constraint
that trigger if two move lines share the same SN for the same product.
It's a wanted behavior that a real move line share the same SN that
temporary move lines.

This commit prevent real and false move lines comparaison.
2017-11-23 17:09:48 +01:00
Simon Lejeune 49c3f64369 [FIX] mrp: workorder: use the reserved move lines
Rev [1] was intended to be applied when changing the lot of the produced
product on the manufacturing order, somewhere along the line the code
was also called when setting the lot_id on the work order. When used in
this context, it broke the reconciliation between the reserved move
lines and the temporary move lines because a lot_produced_id was wrongly
set.

We fix the issue by only applying the code on prod move. This is done by
checking if the move is a production one through the stock move, because
there we are able to differenciate the raw material and production move,
not on the move line where production_id is always set.

[1] 471115b06a

Fixes #20964
2017-11-17 13:32:04 +01:00
Simon Lejeune 99b9874ab3 [FIX] mrp, purchase_mrp: purchase_line_id also with kits
When confirming a move for a kit, it is basically unlinked and replaced
by moves for its component. The link to the purchase line was kept in
v10, but since rev[1] it is not anymore. Make an helper to get the
values and override it in purchase_mrp to add the purchase line link.

[1] https://github.com/odoo/odoo/commit/8248f0e153ae5fcc1449d0d05149b61df615ad4f

opw 779497
2017-11-14 17:44:15 +01:00