Commit Graph
305 Commits
Author SHA1 Message Date
Victor Feyens eaa091e540 [FIX] *: cls as first arg of class methods (C0202)
Part-of: odoo/odoo#86332
2022-04-27 07:51:22 +02:00
Touati Djamel (otd) e37ededc56 [FIX] mrp: stop all timers when cancelling work order
Steps to reproduce the bug:
- Create a manufacturing order to produce “Table”
- Confirm and plan the MO
- Start the work order
- Cancel the MO

Problem:
- The work order is cancelled, but the timers continue to run.
- "Block", "Unblock" and “Unplan" button should be hidden when MO is cancelled

opw-2817842

closes odoo/odoo#89442

X-original-commit: 5682015958d03f4a65969afe3fce9b9b05e5b505
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Djamel Touati (otd) <otd@odoo.com>
2022-04-22 16:59:57 +02:00
Arnold Moyaux d7716f071d [REF] mrp: onchange to compute
This task will:
- Clean the code (e.g. the production's moves are now created directly)
- Have the same behavior when creating object in the UI or directly in
backend

It's mainly on the `mrp.production` object and most of the computed
stored field are used as default value or act like an onchange on draft
production. Once the production order is validated, it's only modify
by direct write

Task-2709753

closes odoo/odoo#83576

Related: odoo/enterprise#24405
Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-04-22 12:04:23 +02:00
Adrien Widart ff7322ed43 [IMP] mrp: select BoM based on rule
Add test for use case fixed by d43e9cb9ad8d1c0c020209de0e8f6ffdcbc960a1

closes odoo/odoo#89237

X-original-commit: 21be0d8e96b9fb6e9fd6476a664ce89b017a7767
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-04-21 13:54:57 +02:00
Arnold Moyaux cf9ff8e41a [FIX] mrp: orderpoint for manufacture not trigger twice
Usecase to reproduce:
With BoM structure
- Product A (RR 1-20)
	|
	Product B (MTO)
		|
		Product C (RR 5-50)
			|
			Product D (Buy)

Launch the RR. The MO are:
Current Behavior
- Product A 20
- Product B 20
- Product C 50
- Product C 70

Expected Behavior
- Product A 20
- Product B 20
- Product C 50

It happens because the MO are created as draft during the
`_run_manufacture` and are confirm at the end of
`_procure_orderpoint_confirm` in '_post_process_scheduler`.

However at the first MO for product A, it creates a MO for product B
and since it consumes product c, it checks if the orderpoint should be
trigger. MO for product C still "draft" and the orderpoint forecast is
now -20, so it will create a new procurement for product C with 70 units

To fix it we take the MO draft linked to the orderpoint for the
forecasted quantity.

closes odoo/odoo#89079

X-original-commit: 199a0dd0f013655a3c2345a41bc7c721e09bfc68
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
2022-04-20 10:33:00 +02:00
Adrien Widart b622f3b9b1 [FIX] mrp: produce a tracked and manufactured component
In some cases, it is not possible to produce a tracked product that has
been used as a component of another product.

To reproduce the issue:
1. Create three products A, B, C:
    - A storable
    - B storable and tracked by lot
    - C consumable
2. Update on-hand qty of B
    - 10 x lot L01
    - 5 x lot L02
3. Create two bills of materials
    - Product: A
        - Components: 1 x B
    - Product: B
        - Components: 1 x C
4. Produce 15 x A (MO01)
    - Note: it should use 10 L01 and 5 L02
5. Produce 15 x B with lot L03 (MO02)

Error: When marking MO02 as done, a user error is displayed: "Cannot set
the done quantity from this stock move, work directly with the move
lines." The user should be able to mark the MO as done.

When confirming MO02, it confirms the associated SMs. Since the
conditions are respected, we try to assign both consumed and finished
moves. Because of step 4, there are two quants for the product B in the
production location (one for L01 and another for L02). Therefore, when
reserving the qty of the finished move, two SML are generated. As a
result, when marking MO02 as done, we write the `quantity_done` on the
finished move. This triggers the inverse method and leads to
`_multi_line_quantity_done_set`, where the error is raised because the
done quantities are not defined on each SML:
https://github.com/odoo/odoo/blob/1354081e43b71edbd434dccc6df6d0881c672a81/addons/stock/models/stock_move.py#L363-L364

Thanks to `_set_quantity_done`, we can write these done quantities on
each SML (and then the incorrect lots will be replaced by the producing
lot).

OPW-2752436

closes odoo/odoo#89015

X-original-commit: 65efb3ec5416fab6bb9ba0a015565b2abb3928cd
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-04-19 15:33:53 +02:00
Touati Djamel (otd) 4f750d8ac9 [FIX] mrp: use the fastest workcenter
Steps to reproduce the bug:
- Create the workcenter_1:
    - Time Efficiency: 100%
    - Capacity: 2
    - Setup Time: 1
    - Cleanup Time: 1

- Create the workcenter_2:
    - Time Efficiency: 100%
     - Capacity: 4
    - Setup Time: 10
    - Cleanup Time: 5
    - Alternative Work centers: workcenter_1

- Create a storable product “P1” with BOM:
    - Add any product as component
    - Add operation:
        - Duration: 60
        - Work center: Workcenter_2

- Create a MO:
    - select “P1” as Product
    - Qty to produce: 4
    - Confirm and Plan

Problem:
The workcenter_1 is chosen while work_center_2 is faster it can manufacture the 4 units at the same time
while workcenter_1 must do two cycles

As the Time Efficiency = 100%, so:
Total duration = (Setup Time + Cleanup Time) + duration_by_unit * nb_cycle
Work_center_1 = (1 + 1) + 60 * 2 = 122
Work_center_2 = (10 + 5) + 60 = 75

The calculation is bad because we use the number of cycles necessary for the work_center defined in the BOM
in the calculation for the alternative work center

opw-2821749

closes odoo/odoo#88945

X-original-commit: deb87a6abf8b8ccc4328eaac21430eedc2536361
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Djamel Touati (otd) <otd@odoo.com>
2022-04-19 09:48:02 +02:00
yhu-odoo 8d0b087525 [IMP] mrp: enable manual consumption on components
Currently, when changing qty_producing on a MO, consumed number of each
component will always be updated. In this commit, we add a new boolean
field manual_consumption to bom.line. If checked, that line won't be
updated when changing qty_producing.
The same but invisible field manual_consumption is also added to each
line on MO. It will use the value on BOM as defualt value. When user
manually set the consued qty, it will be checked automatically. Also,
when user manually update the SML, the field on SM will also be set to
true.

Task-2687494

closes odoo/odoo#80118

Related: odoo/enterprise#25607
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
2022-03-31 17:24:44 +02:00
roen-odoo 8d4e9243a2 [FIX] mrp: compute operation time in bom report
Current behavior:
When you use a workcenter with start and stop time in a BoM the start/stop time is applied for each quantity in the BoM report and workorder. For example if you have 3 quantities the start/stop time
will be applied 3 times.

Steps to reproduce:
- Create a product to manufacture (With atleast 1 operation)
- Create a workcenter that has positive Start/Stop time values
- Start and stop time are multiplied by the quantity in the BoM report

opw-2779381

closes odoo/odoo#86321

X-original-commit: 3bb32903f90fa86eb28b4551b07a5817f8e9f528
Signed-off-by: Adrien Widart <awt@odoo.com>
Signed-off-by: Engels Robin (roen) <roen@odoo.com>
2022-03-13 08:25:38 +00:00
JF Aubert 19f922920e [FIX] mrp: fix cancel and qty propagation post backorder refactor
Re-integrate code from 37681e9d2e24663691b4be022f34c29c7126d9f6
lost with f11fcf6bb4
allowing different quantities to be recorded on work orders
and generate back orders with correct quantities on back work orders
(cancelled if no remaining quantity).

closes odoo/odoo#84502

Task: 2751230
Related: odoo/enterprise#24624
Signed-off-by: Steve Van Essche <svs@odoo.com>
2022-03-10 12:05:49 +00:00
Touati Djamel (otd) a1945fea71 [FIX] mrp: assign backorders according to the reservation method
Steps to reproduce the bug:
- Go to inventory > configuration > Operation types > Manufacturing
- Set "Reservation Method" to "Manually”
- Create a storable product “A”:
    - Update on-hand quantity to 10
- Create a storable product “B”:
    - Create a bill of materials and add the product B as component
- Create and confirm a MO with 2 * product B
- Product A is not reserved for this MO (works as expected)
- Validate the production of 1 unit and create a backorder

Problem:
product A is reserved for the backorder because there is no verification of the reservation method before assigning it.

Solution:
No need to assign here, because when an MO is confirmed, move_raw/move_finished are confirmed too: https://github.com/odoo/odoo/blob/89ddaa49b901787f58a3fa9efb4115d5f2038611/addons/mrp/models/mrp_production.py#L1172

And when a stock_move is confirmed, it is assigned or not by checking the reservation_method:
https://github.com/odoo/odoo/blob/dda9700d8236091626cbd78efc0ca4116e1e1acd/addons/stock/models/stock_move.py#L1239-L1245

opw-2744513

closes odoo/odoo#85508

X-original-commit: 5926bb178236a74999a7868f0acf4ee86b61d7b8
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Djamel Touati (otd) <otd@odoo.com>
2022-02-28 13:53:36 +00:00
Adrien Widart d9b9f94d18 [FIX] mrp: unbuild MO with several lines for same component
When unbuilding a MO, if the latter has several lines (in its
components) for the same tracked product, it won't work.

To reproduce the issue:
1. Create two storable products P_compo and P_finished
    - P_compo is tracked by USN
2. Update P_compo's quantity to 2
3. Create a MO:
    - Product: Finished
    - Quantity: 1
    - Components:
        - 1 x P_compo
        - 1 x P_compo
4. Process the MO
5. Unbuild the MO

Error: a validation error is displayed while it should not "The serial
number has already been assigned: Product: P_Compo, Serial Number: C01"

The for-loop in `action_unbuild` do not handle the case where there are
several SMs for the same product. In the above case, there are two
component lines for P_compo, so there are two SM in `MO.move_raw_ids`.
When unbuilding the MO, the module creates and processes two SMs (SM01,
SM02) that "produce" two P_compo (stored in `produce_moves`).
When processing the first one in the for-loop, it takes the original
moves (so the `MO.move_raw_ids` with the same product) and uses them one
by one. Since SM01 needs one P_compo, it uses the first SM of
`MO.move_raw_ids` (and reuse the lot of that SM). Later on, when
processing SM02 in the for-loop, it does exactly the same thing: it
takes the original moves and uses the first one. Here is the issue: this
first SM has already been used and so does its lot, so this SM should
actually not be used again.

OPW-2715155

closes odoo/odoo#85354

X-original-commit: 8d2597965202a76ddeea8d8fed60b7ac014e2df8
Signed-off-by: Steve Van Essche <svs@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-02-25 10:25:43 +00:00
Arnold Moyaux 23451b645a [FIX] mrp: mass produce should fill qty_done
Usecase:
- Create a BoM with a product tracked by SN
- Create a MO with qty 5
- Mass produce
- Generate

-> All the `stock.move.line` in the move_raw_ids don't have
the qty done prefilled. The purpose of the feature is to create
and validate a lot of MO at once. Which is impossible if you have
to fill all the quantity manualy.

The choice of a new kwargs that directly set the qty_done is justified
by the performance.

-> For On a BoM with 10 components for a final product. For 1000 finished
product with SN
- If we do a loop on each `stock.move.line` to set
qty_done as the reserved quantity. It goes from 40s to 135s
- With the kwargs. It remaines 40s

closes odoo/odoo#83123

X-original-commit: 8ce5926b5a337dc97237f39492e094288b453743
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-02-24 16:41:48 +00:00
Andrea Grazioso (agr-odoo) 073933ab01 [FIX] mrp: merge SFP for 2 different MO
Set the warehouse with manufacturing 3 steps
Create a BoM with a Components that use a Sub BoM
Set Both product MTO + Manufacture
Create a MO
You have only 2 picking for the first MO with the SFP
that contains both the finished product and the intermediate
component. However they are created and moved at two different times
since you could not create the finished product withtout the
component, so there is no meaning to put them both in the same picking.

It happens because the _assign_picking will merge moves with the same
procurement group. In our case, it's the wanted behavior to have the
2 differents SFP linked to the same MO.

The idea between the fix is:
- We want to have the pick components picking merged.
- We want to have the store components split since they come from
different MO
So we create the different procurement groups during the _run_pull with
the picking type of store finished product. This way the pickings won't
be merged during _assign_picking

We will also propagate those groups to the newly created MO in order to
keep the picking type sequence and correct name.

FW PORT of
https://github.com/odoo/odoo/commit/bcfa03821b92bf52675db0e3b54d3cb19dfe3087

opw-2585525

closes odoo/odoo#85195

X-original-commit: a647e680a196f7e6d9147d51dd80f8c31e0e741b
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-02-23 12:09:02 +00:00
Adrien Widart 5d7a376aab [FIX] mrp: list all kit components in delivery slip
When printing a delivery slip, if the delivered product is a kit
composed with a subkit, the products of this subkit won't be listed

To reproduced the issue:
1. Create 5 consumable products: 'Compo 01', 'Compo 02', 'Compo 03',
'Sub Kit', 'Super Kit'
2. Create two phantom-type boms:
    - Sub kit:
        - 1 x Compo 02
        - 1 x Compo 03
    - Super Kit:
        - 1 x Compo 01
        - 1 x Sub Kit
3. Process a delivery with 1 x Super Kit (the picking must be done)
4. Print the delivery slip

Error: The report only contains two lines, i.e. the name of the kit
('Super Kit') and the name of the 'direct' component ('Compo 01)

The issue comes from the SML used to define `kit_move_lines` (XML side).
It uses `has_kits` which only contains the top level kits' SML:
https://github.com/odoo/odoo/blob/1b1067b0cf2a3de2773915ff8205084492b1bbe3/addons/mrp/report/report_deliveryslip.xml#L6-L9
This is the reason why the SML for Compo 02 and Compo 03 are not listed

OPW-2740247

closes odoo/odoo#84735

X-original-commit: 586f900433eb09ee04d0ed073acfdcfa0fc59d58
Signed-off-by: Tiffany Chang <tic@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-02-17 09:06:42 +00:00
Dhwani Patel b9019878ea [FIX] mrp: Use the float_round method to make quantity with the same
decimal places while we compute stock_quants.

closes odoo/odoo#84708

X-original-commit: fba9c9f32cb3d53841946588a999998f6c936e26
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
2022-02-16 14:02:11 +00:00
Adrien Widart 77ca3a830d [FIX] mrp: produce SN product with lot of unbuilt product
To reproduce the issue:
1. Produce a SN product P with lot L
2. Unbuild it
3. Produce 1xP with lot L

Error: When setting the lot, an error is displayed. When marking the MO
as done, a second error is displayed

Both domains in `_onchange_lot_producing` and in the beginning of
`_check_sn_uniqueness` are incorrect. We should centralize the
uniqueness checking thanks to all existing computations in
`_check_sn_uniqueness`. This way, unbuilt/scrapped moves will be
considered

OPW-2721205

closes odoo/odoo#84374

X-original-commit: 2540104e95cea7baaa22ccfce97759771dbbaf34
Signed-off-by: Tiffany Chang <tic@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2022-02-11 11:40:19 +00:00
yhu-odoo 699957fd19 [REV] mrp: don't suggest qty to produce when start workorder
In 9f7e6d2bb6ae0a6b0257edf26a5aa069cd00d78e , when start a workorder, we
always suggest the qty to produce to be the full qty to produce on MO.
If the previous WO produced less than the full qty to produce on MO,
user won't aware of that when start the WO. We revert it in this committ

Task-2678388

closes odoo/odoo#83389

Related: odoo/enterprise#23961
Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-02-03 15:21:35 +00:00
JF Aubert 6acfb2e630 [IMP] mrp : split / merge manufacturing orders
Split a manufacturing order in several parts
using the back order mechanism

Merge several manufacturing orders related to the same product/bom
by cancelling all of them and creating a new one

closes odoo/odoo#82427

Task: 2662566
Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-02-01 18:06:50 +00:00
Adrien Widart 7e950abc6c [FIX] mrp: unbuild a decimal quantity
It is sometimes impossible to unbuild a product because of decimal
values.

To reproduce the issue:
(Enable debug mode)
1. In Settings, enable "Units of Measure"
2. Set the decimal accuracy of "Product Unit of Measure" to 4
3. Set the rounding precision of "Units" to 0.001
4. Create two products P1, P2
5. Create a BoM:
    - Product: P1
    - Quantity: 3
    - Type: Manufacture
    - Components: 5 x P2
6. Process a MO with 3 x P1
7. Create an unbuild order UO:
    - Manufacturing Order: MO
    - Quantity: 1
8. Unbuild

Error: An error message is displayed "The quantity done for the product
"P2" doesn't respect the rounding precision[...]"

At some point, for each SM associated to the UO, the modules uses the
value of `product_uom_qty` to write the done quantity of the SM. The
rounding of `product_uom_qty` is based on "Product Unit of Measure" so
the component's SM has its quantity equal to `1.6667`. Moreover, writing
the done quantity trigger the creation of the associated SML. As a
result, the SML has its done quantity equal to `1.6667` while the
rounding of the associated UoM is `0.001`. When calling `_action_done`
on such a SML, it will raise an error because the value doesn't respect
the rounding.

Side note: the error message is incorrectly written, the indents in the
file are displayed on the front-end.

OPW-2710038

closes odoo/odoo#83369

X-original-commit: c11d772f39179c5dec5eb431b6f4bc02c680643a
Signed-off-by: Adrien Widart <awt@odoo.com>
Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-01-26 13:11:00 +00:00
Tiffany Chang (tic) f052624c97 [FIX] mrp: correctly calculate _set_duration in WO
There were some discrepencies when adding to/removing from WO Real
Duration:
  - When adding time that is brings the total Duration over the expected
    duration, the time should be split between the "productive" and
    "performance" (i.e. reduced speed) times. This is already happening
    when using start/pause buttons, so now it is consistent.
  - Use 'id' instead of "Start Date" to determine which time_ids
    to reduce/remove since adding a large enough "real duration" value
    compared to previous time_id(s) could result in an earlier "Start
    Date" for a newer time_id (i.e. results in which one is adjusted/
    deleted = confusing). Using "End Date" was considered, but same
    non-sequential issue can occur during time split from point above.
  - Correctly determine if the "productivity" should be 'productive' or
    not (i.e. 'performance') based on total WO duration (not duration
    of newly added time_id)

Refinement of Part 4 of Task: 2667151

closes odoo/odoo#80319

Signed-off-by: Arnold Moyaux <arm@odoo.com>
2022-01-21 07:57:49 +00:00
JF Aubert f11fcf6bb4 [REF] mrp: split productions
There is 2 major issues with the production of multiple serials number
- Performance issue
- Duplicated code with classic backorder mechanism

The performance issues exist since backorders were create one by one
and `stock.move` and `stock.move.line` are always recomputed. They
are not created in batch neither.

_generate_backorders is removed and replace by _split_productions. The
functionality are the same. Technicaly it does the maximum in batch,
first it creates all the `mrp.production` then all the `stock.move`
and finaly, it splits the existing `stock.move.line` among the new
`stock.move`
It means that the reservation is not recompute anymore during a
backorder process and will remain the same than the splitted production
order.

Performance metrics (10 components):

	|	2   |	10	100	 1000
before	|   0.47s   |  2.84s | 32.25s | 580.53s
-----------------------------------------------
after	|   0.13s   |  0.36s |  2.60s |  35.17s

task 2633369

Part-of: odoo/odoo#77254
2021-12-22 17:55:49 +00:00
William Henrotin 56e7bcf0cb [REF] *{stock,mrp}*: rename reserved fields
This commit rename product_uom_qty into reserved_uom_qty and product_qty
into reserved_qty on stock move line to stop mistake them with the stock
move quantities fields.

Task: 2648449
Part-of: odoo/odoo#80434
2021-12-07 16:20:06 +00:00
William Henrotin cd9833e4ad [REF] *stock*: rename location destination fields
The stock convention on location name is always to name the destination
`location_dest_id`. It was not the
case on the stock rule model

Task: 2648449
Part-of: odoo/odoo#80434
2021-12-07 16:20:06 +00:00
William Henrotin c146c7d16f [REF] *stock*: rename model stock.location.route into stock.route
Task: 2648449
Part-of: odoo/odoo#80434
2021-12-07 16:20:06 +00:00
William Henrotin 6a23b9bcd6 [REF] *stock*: rename model stock.production.lot into stock.lot
Task: 2648449
Part-of: odoo/odoo#80434
2021-12-07 16:20:05 +00:00
yhu-odoo 79b7967785 [FIX] mrp: cancel leftover moves when create backorder
Previously, when underconsumption occured, we split the move (in
post_inventory). And if backorder, the moves not done would be linked to
the new backorder MO (when backorder MO is created).
After 8883c06ada, we create backorder MOs
before _post_inventory, making it so the moves not done will not be
linked to the backorder MOs and reserved qtys are not released.
To fix, we set cancel_backorder to be true to cancel all the leftover
moves and release the reserved qty.

Task-2697611

closes odoo/odoo#80446

X-original-commit: cffb2b455d73f64d96f91b9e0301c346989eae63
Signed-off-by: Tiffany Chang <tic@odoo.com>
2021-11-26 12:06:20 +00:00
Adrien Widart 42331b3fb5 [FIX] mrp: fully cancel MO even if no component
When cancelling a manufacturing order that does not include any
component, the associated moves won't be cancelled.

To reproduce the issue:
1. Create a storable product P
2. Create & Confirm a MO for 1 x P
3. Cancel the MO
4. Consult the form page of P

Error: The forecasted quantity of P is 1 instead of 0

The finished move associated to the MO hasn't been cancelled. Since [1],
we have the possibility to process MOs without any component, so the
cancellation process shouldn't be bypassed anymore.

[1] bf5e1debf9

OPW-2691422

closes odoo/odoo#80407

X-original-commit: 2adff866a598fc8fb872fb8127875fbb7cc7335c
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2021-11-25 15:19:53 +00:00
roen-odoo f12c91d162 [FIX] mrp : BoM report
Current behavior:
When creating a BOM with quantity different than 1 (here 12) with operation duration 1 minute and work center capacity 23
The BoM Structure & Cost report only changes the time for the operation when the quantity is > 276
However, when planning a MO the expected duration changes to 2 minutes when the quantity is > 23

Expected behavior:
Expected duration should be the same in the MO and BoM report

Steps to reproduce:
- BOM with quantity different than 1 (here 12)
- operation duration 1 minute
- work center capacity 23
- go in BoM report

closes odoo/odoo#80048

X-original-commit: cf90943875da25456cde4faf967ce27d886c0851
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
2021-11-19 09:58:45 +00:00
Adrien Widart 2a19948833 [FIX] mrp: configure in and out moves of draft MO
In multi steps configurations, the additional products of a MO could be
missing in the associated picking

To reproduce the issue:
(Use demo data)
1. In Settings, enable "Multi-Step Routes"
2. Update the current warehouse:
    - Manufacture: 2 steps
3. Create a MO for product "Table Top"
4. Edit the MO:
    - Add 1 x Screw in the components
5. Confirm the MO
6. Open the generated Picking

Error: The operations only contains one line for "Wood Panel". There
should be a second line for the "Screw"

When adding the new component, a new stock move is created but the
latter does not have any `group_id` defined. This is the reason why the
generated picking does not include this stock move.

OPW-2671995

closes odoo/odoo#79894

X-original-commit: 720f29fc6b7626ae734187242870a27065441ac2
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Adrien Widart <awt@odoo.com>
2021-11-17 08:26:19 +00:00
roen-odoo e1a55d8324 [FIX] mrp : bom report duration for dozens
Current behavior :
When a bom is created with uom set as dozens the report
operations time is not correct. For exemple if the operation
time is 10 minutes. The operation time for a dozen should be
120, but at the moment it's 10 minutes

Steps to reproduce:
Have a product in units.
Create a bill of materials in dozens.
Have a operation where the workstation that has a capacity of 1.
Look at the Bill of material cost and structure even though it uses a dozen it shows
the operation time for one unit.

opw-2669899

closes odoo/odoo#79624

X-original-commit: 11f905737ea73aaf26dc792639abf66549a31864
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
Signed-off-by: Engels Robin (roen) <roen@odoo.com>
2021-11-12 12:49:52 +00:00
Tiffany Chang (tic) dd12194834 [FIX] mrp: allow backorder immediate production for SN product
Steps to reproduce:
1. Create Manufacturing Order with quantity >1 of Serial Tracked product
2. Press Mark done. (One Product will be immediated produced with a new
   SN auto-created)
3. Create Backorder
4. Press Mark done on the backorder

Expected Result:
Backorder will also be able to immediate produce and auto-create a new SN

Actual Result:
Usererror because env is still referring to original MO and tries to
produce the same SN again.

closes odoo/odoo#79151

Fixes: odoo/odoo#78134
X-original-commit: 58cd10eb7277312d7d6c5e9da7b52dcbdb114734
Signed-off-by: Arnold Moyaux <arm@odoo.com>
Signed-off-by: Tiffany Chang <tic@odoo.com>
2021-10-29 07:00:44 +00:00
William Henrotin 3a1473c75c [REF] *stock*: rename move_lines into move_ids in stock.picking
closes odoo/odoo#78732

Task: 2673000
Related: odoo/enterprise#21815
Related: odoo/upgrade#2956
Signed-off-by: William Henrotin (whe) <whe@odoo.com>
2021-10-27 15:48:51 +00:00
Rémy Voet (ryv) 88bacad9a0 [FIX] stock,mrp: fix confusing labels
"Material Availability" vs "Component Availability" label means
the same thing but it shouldn't.
- Rename these and add a help string for both fields.
- Change decoration to be green if the MO Readiness is
'ready'.
- The logic of `_compute_*_availability` doesn't take in account the
'ready' `(reservation_)state` to distinct clearly both fields
(`(reservation)_state` vs `*_availability`)

task-2668922

closes odoo/odoo#79033

X-original-commit: acc385137a6a59f3632d91a7fcabd5ab42e8bc7f
Signed-off-by: Tiffany Chang <tic@odoo.com>
2021-10-26 19:40:56 +00:00
Rémy Voet (ryv) b33983d532 [REF] stock*,mrp*: clean setUp vs setUpClass
In a lot of test class, we use `setUp` instead of
`setUpClass`. `setUp` is execute for each test method and `setUpClass`
will be execute only once by Class (and use savepoint + rollback).

Then change setUp into setUpClass reduce the time to make all tests
and avoid to repeat this error for the future.

closes odoo/odoo#78082

Related: odoo/enterprise#21563
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2021-10-13 18:24:16 +00:00
wan 9b0baa3aa4 [FIX] *: product back2basics post-freeze fixes
This should have been a fixup of 37eb0dfbb54db1c062276cd8c172bf8dac9e557b but we needed
to freeze 🤷‍♂️

closes odoo/odoo#77344

closes odoo/odoo#77876

Related: odoo/enterprise#21425
Related: odoo/enterprise#21467
Signed-off-by: Quentin De Paoli (qdp) <qdp@openerp.com>
Signed-off-by: William André (wan) <wan@odoo.com>
2021-10-11 10:15:49 +00:00
clesgow a315ed4268 [IMP] mrp,{purchase_,sale_}stock,stock: decrease qty cascade on MTO
Allow the quantity decrease of Sale Order line of a MTO product.
When increasing de quantities, the related pickings, RFQ / PO are
increased as well, but it wasn't the case if decreasing the quantity.

It should allow the cascade of the decrease in the related pickings as
it would work for the increase. Also modifies a related Purchase Order
if it wasn't yet validated (and thus still a RFQ).

merge_moves was modified so it would allow the merge of negative moves
with positive ones, while trying to "deplete" as much quantity as
possible for each mergeable move.

But negative moves don't always have all required properties to be
compared to the positive ones (some keys might be missing, such as
'created_production_id'). That means we will merge strictly the positive
moves at first as it was done before. But then we try to merge them "less
strictly", using less keys to compare.

Let's say we have those moves (and all other relevant keys matches) :
- move_1 : {qty : 5, created_production_id: 1}
- move_2 : {qty : 3, created_production_id: 2}
- move_3 : {qty : -6, created_production_id: False}

move_1 and move_2 cannot be merged as they don't share the same
created_production_id. But to merge move_3, we'll need to merge it into
move_1 and move_2. It will then deplete move_1 and decrease move_2.
Which will leave us with :
- move_1 : {qty : 0, created_production_id: 1}
- move_2 : {qty : 2, created_production_id: 2}
move_3 will be unliked as its purpose is done.

Task-2513592

Part-of: odoo/odoo#78070
2021-10-08 16:09:37 +00:00
Rémy Voet (ryv) da06104c61 [IMP] stock,mrp: improve _compute_(products/component)_availability
Improve 'Component Availability' and 'Product Availability':
Add these fields in form and tree view (the performance issues
is addressed in next commits and these fields will be load lazily)

task-2579011

Part-of: odoo/odoo#77092
2021-09-24 14:00:22 +00:00
William Henrotin 02770cae97 [FIX] mrp: don't merge move with same components
Component move with same product are not merge at confirmation as it
could be multiple different production steps.

opw-2583848

closes odoo/odoo#76401

X-original-commit: 390fce62462962e9a0131a082317e2e60e34041a
Related: odoo/enterprise#20801
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2021-09-14 15:10:08 +00:00
Ivan Yelizariev 30230d9f4c [FIX] mrp: fix uom conversion in bom kit
no need to make rounding during computing qty_available

STEPS (see the test):

* create product with uom dozens
* create product with uom units
* create bom kit to convert one to another
* set qty on hand to 1 for product dozens
* check qty for product units

BEFORE: qty=11
AFTER:  qty=12

---

opw-2632782

closes odoo/odoo#76242

X-original-commit: 26b28408d8970baa8cbf59ffaff90cab1e579410
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2021-09-09 13:17:39 +00:00
William Henrotin 3ee10159db [FIX] mrp: backorder sequence fallback
In case a production order loses its procurement group. The backorder
generation process do not have access to the last backorder sequence
used. This commit set a default value to avoid any traceback.

The new backorder  name will not be guaranteed exact related to the
production sequence but will be unique in any cases.

closes odoo/odoo#76091

X-original-commit: aae07e88a8166cf26a8c81bb8ee37d630fd6672c
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2021-09-07 15:50:25 +00:00
wan fa034b2a64 [IMP] *: product back2basics 15.0
Rework the whole view, generally.

task-2605931

Part-of: odoo/odoo#75862
2021-09-07 15:50:00 +00:00
Arnold Moyaux 174c3b7951 [IMP] mrp: Mass assignation of SN/Lot in MRP
Allow to produce several serial numbers at once.
Only when BoM do not contain any component tracked by unique serial number
and lot ones are from 1 lot.
Also allow to copy/paste serial numbers.
This applies to manufacturing orders.

Task: 2444742
Part-of: odoo/odoo#71732
2021-09-02 10:41:46 +00:00
JF Aubert 1016bb25b5 [IMP] mrp: Improve MRP Planning features
Review Work Order pop up design:
- add mo reference and Components tab at first
Manufacturing Readiness:
- set 'When all components are available' as default

closes odoo/odoo#75675

Task: 2527408
Related: odoo/enterprise#20515
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
2021-08-31 10:01:03 +00:00
Nathan Marotte (nama) 58d0db2017 [FIX] mrp : wrong expected duration in WC with capacity
Issue: In work centers with a capacity different than 1, the expected
duration was wrongly computed

Steps to reproduce :
 1) Install Manufacture, enable Work Centers in Settings
 2) Create a Work Center, Capacity = 2
 3) Create a Product, with Manufacture as route
 4) Create a Bill of Material :
   Add any component
   Add a operation line :
     Work Center = created at 2)
     Duration Computation = based on tracked time last 1 WO
 5) Create a Manufacturing Order for the product 3), confirm
 6) Set the real duration to 00:10, mark as done
 7) Check the BoM Structure & Cost of the BoM 4)
 -> Operations is 00:20

Why is that a bug:
 To compute the expected duration, in mrp_workorder.py L691 we already
 take into consideration the capacity of the work center.
 When computing the time_cycle, we must give a time_cycle for 1 product
 made with capacity 1, so we must first normalize the qty_produced fetch
  from the DB to make like if we only produced the quantity once but in
  the same amount of time

Side-Note: This also solves an issue with the Duration Computation based
 on tracked time. The `limit` keyword was applied after the `group by`
 so we effectively grouped all the operation_ids together, summing
 their quantities and then limiting on the different operation_ids

opw-2562983

closes odoo/odoo#75557

X-original-commit: c78a25f92716bd6014de381c34f3bc268d1528ae
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: Nathan Marotte <nmarotte@users.noreply.github.com>
2021-08-27 08:27:44 +00:00
Arnold Moyaux ccb260e118 [IMP] mrp, stock: propagate source if the RR is directly trigger
When a document (SO/MO) create a demand and this demand is directly
refill by an orderpoint, then write the source document that triggered
the orderpoint in addition in the origin field.

The purpose is to have an easy base tracking configuration even if
the priority and schedule date (and the final customer) could change
afterward (origin field still editable)

Part-of: odoo/odoo#75144
2021-08-26 13:56:22 +00:00
Tiffany Chang (tic) 37c01cd2c4 [FIX] mrp: correctly copy cancelled MO
Missed the case of copying a cancelled MO needing its cancelled
move_finished_ids to still be copied during commit:
79efbd0e4707892041ee7c58c81c1d7edd033edd

Steps to reproduce:
Step 1: make a MO and cancel it
Step 2: duplicate the MO and try to mark as done

Expected result: qty is produced
Actual result: Validation Error about quantity to produce must be
               positive (due to no move_finished_ids)

Follow up to task: 2618962

closes odoo/odoo#75569

X-original-commit: 56e7d4acc59a802c7613c1184858bda5bfb26748
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Signed-off-by: Tiffany Chang <tic@odoo.com>
2021-08-25 10:06:32 +00:00
Adrien Widart 3e7e6d8497 [FIX] mrp: set backorder name with custom sequence name
If the prefix of the production sequence contains some dashes, it can
lead to undesirable behaviors

To reproduce the error:
(Enable debug mode)
1. Settings > Technical > Sequences & Identifiers > Sequences, edit "San
Francisco Sequence production":
    - Prefix: "WH-MO-"
2. Create a MO
    - Quantity: 2
3. Confirm, Edit:
    - Quantity: 1/2
4. (Keep MO's name in mind and) Validate + Create backorder

Error: Backorder's name is "WH-MO-002" instead of "WH-MO-0000X-002".
Going back to the initial MO, its name became "WH-MO-001" (was
"WH-MO-0000X")

OPW-2618971

closes odoo/odoo#75270

X-original-commit: 076fe045f219dcb018b3b18215bfc3a0cfb3aa46
Signed-off-by: Rémy Voet <ryv-odoo@users.noreply.github.com>
Signed-off-by: Adrien Widart <adwid@users.noreply.github.com>
2021-08-18 15:10:23 +00:00
Adrien Widart 89f5f504be [FIX] mrp: create SM for by-products when RR triggered
When combining a reordering rule, the 3-steps manufacture and
by-products option, the picking from the post-production to the stock
will not contain the residual products produced by the MO (by-products)

To reproduce the error:
1. In Settings, enable:
    - By-Products
    - Multi-Step Routes
2. Inventory > Configuration > Warehouse Management > Warehouses, edit
company's warehouse:
    - Manufacture: 3 steps
3. Create 3 products P_compo, P_finished, P_secondary
    - P_compo is consumable
    - P_finished and P_secondary are storable
    - Routes of P_finished: Manufacture
4. Create a reordering rule for P_finished:
    - Min = Max = 1
5. Create a BoM:
    - Product: P_finished
    - Type: Manufacture
    - Components: 1 x P_compo
    - By-products: 1 x P_secondary
6. Inventory > Operations > Run Scheduler
7. Open the generated MO
8. Check Availability, Produce, Mark as Done
    - Note that in the "Produce" wizard, we mention that one P_secondary
is also produced
    - Also note that in "Finished Products" tab, there are 1 x
P_finished and 1 x P_secondary
9. Open the Transfers

Error: The picking Post-Production -> Stock does not exist

When creating the byproducts move
https://github.com/odoo/odoo/blob/ad62f877c174d56b90ec516cf24494d751383db9/addons/mrp/models/mrp_production.py#L587
the field `move_dest_ids` is present (is the move created after
evaluating the RR)
https://github.com/odoo/odoo/blob/ad62f877c174d56b90ec516cf24494d751383db9/addons/mrp/models/mrp_production.py#L580
so it is used, but this will cause the `_push_apply` to skip the
evaluation of the move
https://github.com/odoo/odoo/blob/f0eaa756c4947e2a595359959b34b14bfda81a07/addons/stock/models/stock_move.py#L678-L679
and `_assign_picking` will not run, as it normally do when creating the
manufacture

Thanks to this change, the picking Post-Production -> Stock will exist
and contain the residual products

OPW-2581762

closes odoo/odoo#75068

X-original-commit: 098af2fa85d2aebfc71b7e2342a1bbf05100e10d
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2021-08-16 07:05:51 +00:00
Rémy Voet (ryv) 7b7f65d504 [IMP] mrp: improve bom filter line by variant feature
On BoM, a component line can be filter out depending
of the product variant to manufacture
(with "Apply on Variant" field).

Extend this feature to operation and byproduct line.

task-2614126

closes odoo/odoo#74973

Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
2021-08-16 07:20:03 +00:00