diff --git a/addons/stock/doc/stock.rst b/addons/stock/doc/stock.rst index 42b9c79b8a5..7bb09b6b2b0 100644 --- a/addons/stock/doc/stock.rst +++ b/addons/stock/doc/stock.rst @@ -238,7 +238,7 @@ To see a calculation of the lead times, take the example of the cabinet above. S Bill of Materials for 1 SHE100 Unit -+-------------+----------+------------ ++-------------+----------+-----------+ | Product Code| Quantity | UoM | +====================================+ |SIDEPAN | 2 | PCE | @@ -253,11 +253,11 @@ Bill of Materials for 1 SHE100 Unit Bill of Materials for 2 SIDEPAN Units -+-------------+----------+------------ ++-------------+----------+-----------+ | Product Code| Quantity | UoM | +====================================+ | WOOD002 | 0.17| M | -+-------------+----------+------------ ++-------------+----------+-----------+ The SIDEPAN is made from an order using the workflow shown. The WOOD002 is purchased on order and the other products are all found in stock. An order for the product SHE100 will then generate two production orders (SHE100 and SIDEPAN) then produce two purchase orders for the product WOOD002. Product WOOD002 is used in the production of both SHE100 and SIDEPAN. Set the lead times on the product forms to the following: